Miscellaneous action | | | 1/14/2011 | | DONE |
|
|
|
Sent to records for scanning.
|
INSP-Final Inspection | 12/16/2010 | 12/16/2010 | 12/17/2010 | P | PASS |
Forrest France
|
|
|
Correction item field verified for completion. Fire sprinkler permit final approved.
|
INSP-Final Inspection | 11/4/2010 | 11/4/2010 | 11/4/2010 | A | PART |
Forrest France
|
|
|
New control valve on order per contractor.
|
Telephone call | | | 11/3/2010 | | DONE |
|
|
|
Spoke with Jim Danes at American Fire, he told me, last week he order a new butterfly valve to replace the one that he altered.
|
INSP-Final Inspection | 8/23/2010 | 8/23/2010 | 8/23/2010 | A | PART |
Forrest France
|
|
|
|
INSP-Conference | 8/17/2010 | 8/17/2010 | 8/17/2010 | P | PART |
Forrest France
|
|
|
Temporary occupancy approval okayed per M. Senteno.
|
INSP-Final Inspection | 8/10/2010 | 8/11/2010 | 8/11/2010 | P | PART |
Forrest France
|
|
|
Final pending wall post indicator/butterfly valve interface approval. Remainder of the scope of work passed inspection.
|
INSP-Sprinkler Rough-in | 8/2/2010 | 8/3/2010 | 8/3/2010 | A | PART |
Forrest France
|
|
|
Correction items verified for completion, overhead fire sprinkler system modifications are good for cover at the drop ceiling.
|
INSP-Sprinkler Rough-in | 7/30/2010 | 7/30/2010 | 7/30/2010 | P | FAIL |
Forrest France
|
|
|
See stamped plans on site for annotations and locations of correction items including one pendent head missing at classroom 129, blocked uprights at class 109, 1/2" extenders at drops in the community room 105, one leaking drop/armover at classroom 110.
|
Issue and Print Permit | | | 7/30/2010 | | |
|
|
|
|
Plan assigned to (Tim) | 7/22/2010 | | 7/27/2010 | | DONE |
Tim Frost
|
|
|
7/27/2010 15:33:38 TRF - activity updated through activity FIRA22 from case FIR10-00358.
|
Plan resubmittals received | | | 7/27/2010 | | |
Tim Frost
|
|
|
rec'd 4 sets
|
Sprinkler Plan Check | 7/27/2010 | | 7/27/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/27/2010 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 7/27/2010 | | 7/27/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 7/27/2010 | | DONE |
|
|
|
t/c w jim at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 7/27/2010 | | DONE |
|
|
|
|
Sprinkler Plan Check | 7/26/2010 | | 7/26/2010 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 7/26/2010 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 7/26/2010 | | DONE |
|
|
|
Emailed review to contractor and designer.
|
Telephone call | | | 7/26/2010 | | DONE |
|
|
|
t/c w jake at ###-#### - permit denied, needs to be picked up and resubmitted
|
Application received | | | 7/22/2010 | | |
|
|
|
|