Miscellaneous action | | | 10/26/2010 | | DONE |
|
|
|
Sent to records for scanning.
|
INSP-Final Inspection | 8/24/2010 | 8/25/2010 | 8/25/2010 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit passed final walkthrough, one remaining tile at a pendent head installed while on site. Permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 8/18/2010 | 8/18/2010 | 8/18/2010 | A | PART |
Forrest France
|
|
|
Correction items noted at the previous inspection verified for completion- Overhead okayed for cover.
|
INSP-Final Inspection | 8/13/2010 | 8/17/2010 | 8/17/2010 | A | PART |
Forrest France
|
|
|
Overhead sprinkler system modifications okayed with the exception of three missing retainer straps at new top beam clamps for armover hangers and one overspaced pendent head to an adjacent wall. See stamped plan set for locations. Remainder of work approved for cover. Need to verify existing system is current with an annual inspection.
|
Plan assigned to (Tim) | 7/28/2010 | | 7/29/2010 | | DONE |
Tim Frost
|
|
|
7/29/2010 13:54:37 TRF - activity updated through activity FIRA22 from case FIR10-00372.
|
Sprinkler Plan Check | 7/29/2010 | | 7/29/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 7/29/2010 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/29/2010 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 7/29/2010 | | 7/29/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 7/29/2010 | | DONE |
|
|
|
t/c w bryan at ###-#### -permit ready and fees given
|
Permit Ready to Issue | | | 7/29/2010 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/29/2010 | | |
|
|
|
|
Application received | | | 7/28/2010 | | |
|
|
|
|