Miscellaneous action | | | 9/20/2010 | | DONE |
|
|
|
FA plans taken to records for scanning.
|
INSP-Final Inspection | 9/9/2010 | 9/10/2010 | 9/10/2010 | A | PASS |
Forrest France
|
|
|
Noted corrections verified for compliance. Fire alarm testing passed, permit finaled.
|
INSP-Final Inspection | 9/8/2010 | 9/9/2010 | 9/9/2010 | A | FAIL |
Troy Cobbley
|
|
|
Still need to test the duct smoke detectors, heat detectors and smoke detectors. A single smoke detector needs to be provided on the south side of the beam and the two smoke detectors in the center of the dining area need to be mounted at the roof deck instead of the bottom chord of the trusses. One strobe needed to have the candella increased due to overspacing. The PIV tamper switch was wired backwards and one other tamper switch had been by-passed. Both were repaired while I waited. The EOL tested ok as well as the sprinkler system devices and the hood suppression system. Signal reports are needed showing todays work.
|
Plan assigned to (Stephanie) | 8/18/2010 | | 9/8/2010 | | DONE |
Stephanie L. Cobbley
|
|
|
9/8/2010 11:48:14 SLC - activity updated through activity FIRA24 from case FIR10-00402.
|
Alarm Plan Check | 9/8/2010 | | 9/8/2010 | | PASS |
Stephanie L. Cobbley
|
|
|
Resubmittals approved with redlines and review comments
|
PLANS TAKEN FRONT DESK ALARM | | | 9/8/2010 | | DONE |
|
|
|
Redlined approved resubmittal documents available at front counter
|
Inspection Record Card- Fire | 9/8/2010 | | 9/8/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 9/8/2010 | | DONE |
|
|
|
left vm for ken at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 9/8/2010 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/8/2010 | | DONE |
Tisha Gallop
|
|
|
|
Early Start | | | 9/3/2010 | | DONE |
|
|
|
An early start request has been approved for this project
|
Plan resubmittals received | | | 9/1/2010 | | |
Stephanie L. Cobbley
|
|
|
rec'd 2 sets
|
1st review completed | | | 8/26/2010 | | DONE |
|
|
|
|
Alarm Plan Check | 8/26/2010 | | 8/26/2010 | | FAIL |
Stephanie L. Cobbley
|
|
|
Plans denied - see redlines and review comments
|
Miscellaneous action | | | 8/26/2010 | | DONE |
|
|
|
Faxed denied review comments to contractor
|
Miscellaneous action | | | 8/26/2010 | | DONE |
|
|
|
Placed denied, redlined plans at front counter for contractor pick up
|
Application received | | | 8/18/2010 | | |
|
|
|
|