Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberFIR10-00407
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 8400 W FRANKLIN RD
Project NameVolkswagen Dealership
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of 6"x70' of C-900 underground piping with appropriate fitting and thrust blocks.

Building Department Scope:

To remodel and add onto an existing 10,065 square foot, two story, masonry and wood framed automobile dealership building. To convert the service area, on the north side of the building, to a new Prep Area #114 and enlarged Parts Area #113. To relocate the employee restroom and locker room; to convert the two first floor offices to a lounge area; to demo and remove the entry canopy and to remove a 500 sq. ft. showroom display area on the south side of the building. To construct a new 115 sq. ft. entry vestibule and to construct a new 5,370 sq. ft., one story, Service Area addition on the west side of the building. To refurbish the 2,530 sq. ft. second floor, including relocating and constructing a new interior stairway, and relocating and installing a new exterior egress stairway including a new corridor leading to the exterior stairway. This permit also includes related site improvements. All construction per the approved plans and attached comment list. JCM --TRF--
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  1/14/2011 DONE
Sent to records for scanning.
FIR-Aging Inspection12/9/201012/9/201012/16/2010 PASS
DetailsTroy Cobbley
Permit has been finaled
INSP-Final Inspection12/15/201012/15/201012/15/2010PPASS
DetailsTroy Cobbley
Permit finaled
CHANGE STATUS TO (ISS)  10/26/2010 DONE
was changed to REV when plan resubmittals were added (should have been on Fir10-00470)
Plan assigned to (Tim)9/16/2010 10/12/2010 DONE
DetailsTim Frost
Plan assigned to (Tim)10/5/2010 10/12/2010 DONE
DetailsTim Frost
INSP-Sprinkler Rough-in9/30/201010/1/201010/1/2010APASS
DetailsTroy Cobbley
The connection to the United Water tie in is ok to cover.
INSP-Sprinkler Rough-in9/30/20109/30/201010/1/2010PPASS
DetailsTroy Cobbley
The remaining underground supply piping can be covered except for the tie in to the United Water section. This section did not have the thrust blocks poured yet.
CHANGE STATUS TO (ISS)  9/30/2010 DONE
per trf
INSP-Sprinkler Rough-in8/26/20108/27/20108/27/2010APASS
DetailsTroy Cobbley
The 5' underground supply piping stub out is ok for cover.
INSP-Sprinkler Rough-in8/26/20108/26/20108/27/2010PCANC
DetailsTroy Cobbley
Terry-Underground 5 feet out for cover inspection please Phone #: ###-####
Plan assigned to (Tim)8/18/2010 8/19/2010 DONE
DetailsTim Frost
8/19/2010 14:23:55 TRF - activity updated through activity FIRA22 from case FIR10-00407.
Sprinkler Plan Check8/19/2010 8/19/2010 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  8/19/2010 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  8/19/2010 DONE
DetailsTim Frost
Inspection Record Card- Fire8/19/2010 8/19/2010 DONE
DetailsPatricia Smith
Telephone call  8/19/2010 DONE
left vm for randy at ###-#### - permit ready and fees given
Permit Ready to Issue  8/19/2010 DONE
Details
Issue and Print Permit  8/19/2010 DONE
DetailsTisha Gallop
Application received  8/18/2010