Miscellaneous action | | | 6/15/2011 | | DONE |
|
|
|
Drawings taken to records for scanning.
|
Miscellaneous action | | | 6/15/2011 | | DONE |
|
|
|
Drawings taken to records for scanning.
|
INSP-Final Inspection | 3/22/2011 | 3/24/2011 | 3/24/2011 | A | PASS |
Forrest France
|
|
|
Corrections finished. Fire alarm passed final inspection.
|
INSP-Final Inspection | 3/15/2011 | 3/17/2011 | 3/17/2011 | A | FAIL |
Forrest France
|
|
|
Speakers are not operational.
|
INSP-Final Inspection | 3/14/2011 | 3/15/2011 | 3/15/2011 | A | CANC |
Forrest France
|
|
|
7:30am if possible. Nick is the contact his no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
|
INSP-Final Inspection | 2/9/2011 | 2/14/2011 | 2/14/2011 | A | FAIL |
Forrest France
|
|
|
C/N items include; pressure switch at the dry system must report as an alarm condition and initiate activation of the outside bell, adjust cd settings at the first floor vestibule and adjacent to the reception desk per plan, provide notification at the employee work room per plan review red line notes, mechanical room duct detector activates general alarm condition, provide a WP notification appliance at the 2nd floor shower room, replace 15cd strobe only per plan at the 2nd floor west corridor. KH monitor tested okay, remainder of fire sprinkler riser points also okayed.
|
INSP-Sprinkler Rough-in/Hydro | 2/9/2011 | 2/14/2011 | 2/9/2011 | A | CANC |
Forrest France
|
|
|
Please schedule for 7:30am. Rafe with Protex is the contact his cell no. is ###-####. Thank you.
Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
|
INSP-Final Inspection | 1/27/2011 | 2/1/2011 | 1/31/2011 | A | NR |
Forrest France
|
|
|
|
INSP-Final Inspection | 1/27/2011 | 1/28/2011 | 1/27/2011 | A | CANC |
Forrest France
|
|
|
Request for 7:30am inspection. Rafe with Protex is the contat, his cell no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
|
Plan assigned to (Stephanie) | 1/24/2011 | | 1/26/2011 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Alarm Plan Check | 1/26/2011 | | 1/26/2011 | | PASS |
Stephanie L. Cobbley
|
|
|
Approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 1/26/2011 | | DONE |
|
|
|
Redlined approved plans available at front counter.
|
Inspection Record Card- Fire | 1/26/2011 | | 1/26/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 1/26/2011 | | DONE |
|
|
|
t/c w mike - permit (plan mod) ready and fees given
|
Permit Ready to Issue | | | 1/26/2011 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/26/2011 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 1/26/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plan resubmittals received | | | 1/24/2011 | | |
|
|
|
|
INSP-Alarm Testing | 11/15/2010 | 11/15/2010 | 11/16/2010 | P | PART |
Forrest France
|
|
|
Notification testing at the basement level previously completed- ref. building permit activity notes.
|
Meeting | | | 10/12/2010 | | DONE |
|
|
|
Tom Gainor and I met with the fire alarm contractor, electrical contractor, general contractor, architect, and the building representative to set off the existing fire alarm system. The intent was to determine if the existing horns would inhibit the intelligibility of the speakers within the Lindsay Hall area of work. It was determined that the devices with horns on the 'border' of the scope of work would need to be replaced with either strobe only devices (in areas already containing speakers), or combination speaker/strobes (in areas not already equipped with speakers). It was also stated that if, during the inspection, the inspector determines other devices need to be replaced due to intelligibility issues within the scope of work, then it would need to be done prior to signing off the permit. I let the contractors know that the changes could all be implemented in the field, and then upon completion of the installation, they would need to submit all the changes in a plan modification prior to calling for a final inspection.
|
Miscellaneous action | | | 10/12/2010 | | DONE |
|
|
|
During a site visit of the scope of work, it was noted that several of the existing areas had intelligibility problems due to a combination of horn/strobes and speaker/strobes being installed in the same spaces. It was also noted that some of the existing combination horn/strobe devices had the 'horn' portion of the device disconnected. Tom Gainor and I informed the contractors that the areas did not meet the code the system was installed under, and that they may be required to correct those spaces. We also notified the contractors that code does not allow disconnecting a portion of the device due to the product listing and problems with having a 'presumed' device that is not fully operational. I told the contractors that as long as the existing devices did not disrupt the intelligibility or operation of the devices within the scope of work of the Lindsay Hall permit, then it would not prevent the permit from being signed off. The issue of the problems with the existing notification has been handed off to the fire department for further review.
|
Issue and Print Permit | | | 10/7/2010 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/6/2010 | | 10/6/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 10/6/2010 | | DONE |
|
|
|
t/c w mike at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 10/6/2010 | | DONE |
|
|
|
|
Telephone call | | | 10/5/2010 | | DONE |
|
|
|
Rob Ahten called to let me know he'd like me to approved the submittals and understands that a plan modification will be required (subject to additional review fees). He also requested a meeting with Scott A. and I, along with the general contractor and architect to address the existing horn/strobe vs. speaker/strobe issue. I let him know that I would get with Scott regarding his schedule and email and/or call him back.
|
Miscellaneous action | | | 10/5/2010 | | DONE |
|
|
|
Sent Rob Ahten an email stating that PDS Fire Alarm Plan review and Boise City Fire Dept. want to schedule a time to go to the site to set off the fire alarm system and walk through the building to determine intelligibility and/or any problems with intelligibility. Although the main focus will be on Lindsay Hall, we will need access to the entire building (all rooms and areas). I asked him to please choose either this Friday (October 8th) or Tuesday, Thursday, or Friday of next week (October 12th, 14th, or 15th). Early morning is preferred if possible. I let him know that the meeting he requested can be done at this time as well. I also reitterated as a side note that the fire alarm plans will be approved with notes/comments, and with the understanding that a plan modification will be required to be submitted and approved prior to calling for a final inspection. I stated additional review fees will apply.
|
Alarm Plan Check | 10/5/2010 | | 10/5/2010 | | PASS |
Stephanie L. Cobbley
|
|
|
see review comments and redlines. A plan modification will be required prior to calling for a final inspection
|
PLANS TAKEN FRONT DESK ALARM | | | 10/5/2010 | | DONE |
|
|
|
Approved redlined plans available at front counter
|
Plan assigned to (Stephanie) | 8/23/2010 | | 10/5/2010 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Telephone call | | | 10/4/2010 | | DONE |
|
|
|
Spoke with Mike Bayse regarding discrepencies in the plans. I let him know there were several items from the first review that were not addressed in the resubmittal. I told him I could go ahead and approve them with the understanding that a plan modification (with additional review fees) would need to be submitted and approved prior to final inspection; or, I could reject these and they could resubmit, thereby only paying one review fee. Mike requested that I approve the drawings with the understanding a plan modification will be submitted and approved prior to calling for a final inspection (additional review fees will apply)
|
Telephone call | | | 10/4/2010 | | DONE |
|
|
|
Recieved a phone call (after the phone call was made to Mike Bayse) from Rob Ahten asking me to please wait to approve or reject the plans until tomorrow.
|
Plan resubmittals received | | | 9/30/2010 | | |
Stephanie L. Cobbley
|
|
|
rec'd 2 sets
|
1st review completed | | | 8/31/2010 | | DONE |
|
|
|
|
Alarm Plan Check | 8/31/2010 | | 8/31/2010 | | FAIL |
Stephanie L. Cobbley
|
|
|
Plans denied. See redlines and review comments.
|
Telephone call | | | 8/31/2010 | | DONE |
|
|
|
Spoke to architect and fire alarm contractor regarding the changes that need to be made and let them know a resubmittal is required.
|
Miscellaneous action | | | 8/31/2010 | | DONE |
|
|
|
Faxed review comments of the denied plans to the applicant
|
Miscellaneous action | | | 8/31/2010 | | DONE |
|
|
|
placed denied plans and comments at the front counter for customer pick-up.
|
Application received | | | 8/23/2010 | | |
|
|
|
|