Miscellaneous action | | | 12/2/2010 | | DONE |
|
|
|
Plans taken to records for scanning.
|
INSP-Final Inspection | 9/24/2010 | 9/24/2010 | 9/24/2010 | P | PASS |
Forrest France
|
|
|
Fire alarm permit work okayed for final, address switch repaired while on site. Inspection passed.
|
INSP-Alarm Testing | 9/24/2010 | 9/24/2010 | 9/24/2010 | P | PASS |
Forrest France
|
|
|
Reinspection for noted correction items passed at the 2nd, 5th and 6th floors.
|
INSP-Final Inspection | 9/23/2010 | 9/23/2010 | 9/24/2010 | P | FAIL |
Forrest France
|
|
|
Correction items include relocate three SD too close to HVAC diffusers, adjust cd setting per plan at one room 5th floor, voice evacuation message does not meet intelligibility or audibility requirements.
|
INSP-Alarm Testing | 9/22/2010 | 9/22/2010 | 9/22/2010 | A | PART |
Forrest France
|
|
|
After hours inspection scheduled 9/23 PM.
|
Issue and Print Permit | | | 9/14/2010 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 8/30/2010 | | 9/13/2010 | | DONE |
Stephanie L. Cobbley
|
|
|
9/13/2010 15:33:44 SLC - activity updated through activity FIRA24 from case FIR10-00423.
|
Plan assigned to (Stephanie) | 8/30/2010 | | 9/13/2010 | | DONE |
Stephanie L. Cobbley
|
|
|
9/13/2010 15:33:44 SLC - activity updated through activity FIRA24 from case FIR10-00423.
|
Telephone call | | | 9/13/2010 | | DONE |
|
|
|
Mark with Simplex called for Charlie to find out what information I needed. I let him know I needed information on the existing amplifiers (i.e. what total watts per amp are being used, which speaker circuits go to which amps, how many amplifiers are available etc...) as well as the data sheet for the 4100+. He let me know he'd email the information as soon as possible.
|
Miscellaneous action | | | 9/13/2010 | | DONE |
|
|
|
Recieved an email with the data sheet as requested, a generic one-line, and text indicating each amplifier is capable of 100 watts.
|
1st review completed | | | 9/13/2010 | | DONE |
|
|
|
|
Alarm Plan Check | 9/13/2010 | | 9/13/2010 | | PASS |
Stephanie L. Cobbley
|
|
|
plans approved - see review comments
|
PLANS TAKEN FRONT DESK ALARM | | | 9/13/2010 | | DONE |
|
|
|
Approved plans available at front counter
|
Inspection Record Card- Fire | 9/13/2010 | | 9/13/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 9/13/2010 | | DONE |
|
|
|
left vm for charlie at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 9/13/2010 | | DONE |
|
|
|
|
Telephone call | | | 9/10/2010 | | DONE |
|
|
|
Spoke with Charlie at Simplex to request information on the 4100+ the speakers are being added to. I explained I need to know the available watts and which amp each of the speaker circuits are tied in to. He let me know he would not have the information available until Monday (9/13/10)
|
Application received | | | 8/30/2010 | | |
|
|
|
|