Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR10-00425
StatusFinaled
Name TRIBAL FIRE SYSTEMS
Site Address 2481 E WARM SPRINGS AVE
Project NameWarm Springs Golf Maint Bldg
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of a long narrow prefabricate maintenance facility with Z purlin and beam construction. The west portion has a small office area. The sprinkler system is designed for ordinary hazard II. The layout is a side feed system with a 4” main and telescoping branch piping. The system is supplied by 6” C-900 underground piping and a 4” backflow preventer.

Plan Mod Scope:
? Changed the underground slightly
? Added and additional branch line due to construction change. New hydraulics were provided.
? Added a sprinkler below an overhead door. Orignal plans called fore a roll up door.
? Revised the earthquake bracing due to construction.

Building Department Scope:

Boise City Parks - Warm Springs Golf Course - Storage and Office Building - To construct a new 7,105 square foot, one story, pre-engineered metal office, shop and storage building. This permit also includes related site improvements. This building is fully fire sprinkled. (Office: 910 sq. ft., Shop: 1730 sq. ft., Storage: 4465 sq. ft.) All construction per the approved plans and attached comment list. JCM


Notice for Fire Protection Contractor:

The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. These changes may affect the sprinkler system. The sprinkler contractor will be required to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit they will do so on their own cognizance
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  6/8/2011 DONE
Sent to records for scanning.
INSP-Final Inspection1/20/20111/20/20111/20/2011APASS
DetailsForrest France
Correction items verified for completion. Fire sprinkler permit finaled.
INSP-Final Inspection1/18/20111/19/20111/19/2011ACANC
DetailsForrest France
I''m coming from Kuna please give me atleast a 30 minute heads up. Thx, Clarence Phone #: ###-#### >> Inspection requested via web by Clarence McLain Inspection cancelled from web by: John Venche
INSP-Sprinkler Rough-in/Hydro1/13/20111/14/20111/14/2011APART
DetailsTroy Cobbley
Overhead hydrostatic test completed satisfactory per inspector 410.
INSP-Sprinkler Rough-in/Hydro1/12/20111/13/20111/13/2011PPART
DetailsForrest France
Underground fire supply line hydrostatic test completed acceptable.
INSP-Final Inspection1/12/20111/13/20111/13/2011PNR
DetailsForrest France
Missing field ceiling tile, escutcheons, DCVA certification, forward flow, etc.
INSP-Sprinkler Rough-in12/27/201012/28/201012/28/2010APART
DetailsForrest France
Overhead rough-in approved for cover at the office area grid ceilings. Need to provide coverage below the 6'x6' hood at the shop bay, include seismic clearance at main penetrations through non-frangible wall construction, install correct temp. rated heads within the zone of influence at unit heaters in the shop areas (SW and uprights).
INSP-Sprinkler Rough-in12/16/201012/17/201012/17/2010ADEFR
DetailsForrest France
Inspection postponed due to jobsite condtions and access to city approved plan set on site.
Plan assigned to (Tim)12/9/2010 12/13/2010 DONE
DetailsTim Frost
Sprinkler Plan Check12/13/2010 12/13/2010 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  12/13/2010 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  12/13/2010 DONE
DetailsTim Frost
Permit Ready to Issue  12/13/2010 DONE
Inspection Record Card- Fire12/13/2010 12/13/2010 DONE
DetailsPatricia Smith
Telephone call  12/13/2010 DONE
t/c w clarence at ###-#### - permit (plan mod) ready and fees given
(F) Reprint permit  12/13/2010 DONE
CHANGE STATUS TO (ISS)  12/13/2010  
Plan resubmittals received  12/9/2010 DONE
DetailsTisha Gallop
Plan Modifcation: received three copies of application, submittal documents and plans; routed to Fire Review.
INSP-Supply line flush12/1/201012/2/201012/6/2010PPART
DetailsForrest France
Underground fire supply line flush completed acceptable.
INSP-Supply line flush11/30/201012/1/201012/1/2010PCANC
DetailsForrest France
Phone #: ###-#### >> Inspection requested via web by John Venche Inspection cancelled from web by: John Venche
INSP-Sprinkler Rough-in/Hydro10/12/201010/13/201010/13/2010PFAIL
DetailsForrest France
UG fire supply line hydrostatic test failed due to pressure loss below 200 psi at the guage.
INSP-Sprinkler Rough-in/Hydro10/13/201010/13/201010/13/2010APART
DetailsForrest France
Underground fire supply line is approved for bury. Need to provide method for seismic clearance at the floor slab. Discussed fire code review notes regarding PI valves and riser room ratings.
Issue and Print Permit  9/14/2010  
Sprinkler Plan Check9/13/2010 9/13/2010 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  9/13/2010 DONE
DetailsTim Frost
Inspection Record Card- Fire9/13/2010 9/13/2010 DONE
DetailsPatricia Smith
Telephone call  9/13/2010 DONE
t/c w clarence at ###-#### - permit ready and fees given
Permit Ready to Issue  9/13/2010 DONE
Details
Plan assigned to (Tim)8/31/2010 9/13/2010 DONE
DetailsTim Frost
9/13/2010 14:11:21 TRF - activity updated through activity FIRA22 from case FIR10-00425.
Miscellaneous action  9/10/2010 DONE
denied plans picked up by contractor
Plan resubmittals received  9/10/2010 DONE
DetailsTisha Gallop
received three copies of application, submittal documents and plans; taken to fire review.
Sprinkler Plan Check9/7/2010 9/7/2010 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  9/7/2010 DONE
DetailsTim Frost
Telephone call  9/7/2010 DONE
t/c w clarence at ###-#### - permit denied - needs to be picked up and resubmitted
Application received  8/31/2010  
Pending Assignment by SAM8/31/2010 8/31/2010 DONE
DetailsAlexandra L. DeYoung
8/31/2010 11:37:29 ALR - activity updated through activity FIRA158 from case FIR10-00425.