Miscellaneous action | | | 2/9/2011 | | DONE |
|
|
|
Plans taken to records for scanning.
|
INSP-Final Inspection | 12/22/2010 | 12/22/2010 | 12/23/2010 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Miscellaneous action | | | 12/20/2010 | | DONE |
|
|
|
Received requested as-built information
|
INSP-Final Inspection | 12/16/2010 | 12/17/2010 | 12/17/2010 | A | FAIL |
Troy Cobbley
|
|
|
Re-label zone #1 since it now includes the basement zone. This arrangement has been approved by the plan reviewer. Also provide as-builts as discussed.
|
FIR-Aging Inspection | 12/16/2010 | 12/16/2010 | 12/16/2010 | | NR |
Troy Cobbley
|
|
|
Has been called in for tomorrow morning.
|
Issue and Print Permit | | | 9/16/2010 | | DONE |
|
|
|
|
Case Summary | | | 9/15/2010 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 9/2/2010 | | 9/10/2010 | | DONE |
Stephanie L. Cobbley
|
|
|
9/10/2010 13:46:14 SLC - activity updated through activity FIRA24 from case FIR10-00432.
|
Plan assigned to (Stephanie) | 9/2/2010 | | 9/10/2010 | | DONE |
Stephanie L. Cobbley
|
|
|
9/10/2010 13:46:14 SLC - activity updated through activity FIRA24 from case FIR10-00432.
|
Plan resubmittals received | | | 9/10/2010 | | DONE |
|
|
|
|
Alarm Plan Check | 9/10/2010 | | 9/10/2010 | | PASS |
Stephanie L. Cobbley
|
|
|
Quick permit approved - no written review comments
|
PLANS TAKEN FRONT DESK ALARM | | | 9/10/2010 | | DONE |
|
|
|
Approved quick permit documents available at front counter
|
Inspection Record Card- Fire | 9/10/2010 | | 9/10/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 9/10/2010 | | DONE |
|
|
|
left vm for john at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 9/10/2010 | | DONE |
|
|
|
|
1st review completed | | | 9/3/2010 | | DONE |
|
|
|
|
Telephone call | | | 9/3/2010 | | DONE |
|
|
|
Spoke to Earl at Fire Sentry Systems to go over issues with the elevator recall functions on the zoned panel and missing information on the matrix. Based on the conversation, a resubmittal is required because smoke detector relay base and functions were not provided, the 120v monitoring for the shunt trip was not indicated, and incorrect functions for the elevator fireman's hat light were not shown on the matrix.
|
Alarm Plan Check | 9/3/2010 | | 9/3/2010 | | FAIL |
Stephanie L. Cobbley
|
|
|
Plans failed. Need more detailed information for the devices used for elevator recall and shunt trip.
|
Application received | | | 9/2/2010 | | |
|
|
|
|