INSP-Final Inspection | 1/11/2011 | 1/11/2011 | 1/12/2011 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 1/2/2011 | 1/3/2011 | 1/3/2011 | A | CANC |
Troy Cobbley
|
|
|
not ready for final inspection
|
FIR-Aging Inspection | 12/27/2010 | 12/27/2010 | 12/27/2010 | | NR |
Troy Cobbley
|
|
|
This entry is being added from an original entry posted 12-22-10.
I found the the existing fire sprinkler system had been rendered inoperative in the north end of the building. I contacted Mark Sentenno and Gordan Goldsmith with the fire dept and let them know the situation. On site I spoke to the general contractor about the situation and he contacted the fire sprinkler contractor who was able to put the entire sprinkler system back in service within acouple of hours.
Upon last drive by the system was in service.
|
Plan assigned to (Tim) | 9/7/2010 | | 9/8/2010 | | DONE |
Tim Frost
|
|
|
9/8/2010 11:01:42 TRF - activity updated through activity FIRA22 from case FIR10-00445.
|
Sprinkler Plan Check | 9/8/2010 | | 9/8/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 9/8/2010 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/8/2010 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 9/8/2010 | | 9/8/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 9/8/2010 | | DONE |
|
|
|
t/c w chris at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 9/8/2010 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/8/2010 | | DONE |
|
|
|
|
Application received | | | 9/7/2010 | | |
|
|
|
|