Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberFIR10-00463
StatusFinaled
Name CURTIS FIRE SPRINKLER SERVICE INC
Site Address 250 S 5TH ST Unit: 660
Project NameAherns & DeAngeli
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of relocating and adding sprinklers to accommodate new wall and ceiling configuration. The existing system is a 2" loop with telescoping lines. Pipe sized have not changed. The designer indicates the pipe sizing is based on the original 8th floor calculations. The designer indicated there is a pump that was tested at S-175, R-129, Q-1125. All sprinklers are to be quick response type.

Building Department Scope:

(AHRENS & DeAHGELI - CW Moore Plaza - Ste #660) Permit is to expand a 6,389 square foot tenant space into an adjacent 2,698 square foot tenant space and remodel the new 9,087 square foot tenant space for new tenant. Approval contingent upon adhering to the approved plans on file. Work to include: [construction of interior non-bearing wall to create a four new offices, a 250 square foot conference room, a file room, and a reception area], installation of new accessible doors and hardware, and finishes in compliance with chapter 8 of the 2006 IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. This building is sprinklered to comply with high rise provisions. NOTE: Corridor down graded due to letter verifying quick response heads. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  6/8/2011 DONE
Sent to records for scanning.
INSP-Final Inspection2/3/20112/4/20112/4/2011APASS
DetailsForrest France
Fire sprinkler permit work passed final inspection.
FIR-Aging Inspection12/23/201012/23/201012/28/2010 DONE
DetailsForrest France
Work in progress
INSP-Sprinkler Rough-in10/8/201010/8/201010/13/2010PPART
DetailsForrest France
Okay to cover overhead fire sprinkler work at the drop ceilings.
Plan assigned to (Tim)9/16/2010 9/20/2010 DONE
DetailsTim Frost
9/20/2010 08:27:52 TRF - activity updated through activity FIRA22 from case FIR10-00463.
Sprinkler Plan Check9/20/2010 9/20/2010 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  9/20/2010 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  9/20/2010 DONE
DetailsTim Frost
Override - Parcel Holds  9/20/2010  
Inspection Record Card- Fire9/20/2010 9/20/2010 DONE
DetailsPatricia Smith
Telephone call  9/20/2010 DONE
t/c w don at ###-#### - permit ready and fees given
Override - Parcel Holds  9/20/2010  
Permit Ready to Issue  9/20/2010 DONE
Details
Override - Parcel Holds  9/20/2010  
Issue and Print Permit  9/20/2010  
Application received  9/16/2010