INSP-Final Inspection | 6/4/2012 | 6/4/2012 | 6/4/2012 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
Miscellaneous action | | | 6/4/2012 | | DONE |
|
|
|
Plans taken to records for scanning.
|
INSP-Sprinkler Rough-in/Hydro | 5/4/2012 | 5/7/2012 | 5/7/2012 | A | FAIL |
Troy Cobbley
|
|
|
Testing is complete. Need as-builts showing the lack of trouble output and NFPA 72 record of completion forms.
|
FIR-Aging Inspection | 4/26/2012 | 4/26/2012 | 5/2/2012 | | NR |
Troy Cobbley
|
|
|
I left a voice message on Mark's phone requesting job status.
|
FIR-Aging Inspection | 1/11/2012 | 1/11/2012 | 1/11/2012 | | NR |
Troy Cobbley
|
|
|
I spoke to mark about getting this permit finaled. He stated he would follow up and get back to me.
|
FIR-Aging Inspection | 3/22/2011 | 3/22/2011 | 3/28/2011 | | NR |
Troy Cobbley
|
|
|
John is following up on permit status.
|
INSP-Final Inspection | 12/27/2010 | 12/28/2010 | 12/28/2010 | A | FAIL |
Troy Cobbley
|
|
|
Arrived at job site. Did not perform inspection because the NetCon rating was a 6 where a 0-5 rating is required.
|
Issue and Print Permit | | | 9/29/2010 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 9/20/2010 | | |
|
|
|
|
Plan assigned to (Stephanie) | 9/20/2010 | | 9/20/2010 | | DONE |
Stephanie L. Cobbley
|
|
|
9/20/2010 13:38:11 SLC - activity updated through activity FIRA24 from case FIR10-00469.
|
1st review completed | | | 9/20/2010 | | DONE |
|
|
|
|
Alarm Plan Check | 9/20/2010 | | 9/20/2010 | | PASS |
Stephanie L. Cobbley
|
|
|
See review comments
|
PLANS TAKEN FRONT DESK ALARM | | | 9/20/2010 | | DONE |
|
|
|
Approved plans available at front counter
|
Permit Ready to Issue | | | 9/20/2010 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 9/20/2010 | | 9/20/2010 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 9/20/2010 | | DONE |
Barbara Stitt
|
|
|
Called Allied General and told them that permit is ready & fees due on 9-20-10 @ 1:51pm
|