Permit NumberFIR10-00473
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 501 W FRONT ST
Project NameConcordia University Law Schoo
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of approximately 45' of 6" C-900 underground piping and associated fittings and thrust blocks. This permit is for the underground only. The above ground piping will follow under a separate permit.

Building Department Scope:

CONCORDIA UNIVERSITY - (FOUNDATION PERMIT) - This permit is issued to pour footings and foundation and do underground utilities for the future construction of the Concordia University three story addition. Work under this permit shall not proceed beyond the pour of the foundation until final approval of plans and issuance of the full building permit. That permit has not yet been applied for. As owner or designated agent, I acknowledge that I am performing this work at my own risk without assurance that the permit for the entire building structure will be granted, and I agree to make any modifications to the early foundation work performed as may be required to comply with the City Codes and the final approved building plans and conditions. All per engineered plans on file. DRH10-00026/Demo Permit BLD10-01131/Grading Permit BLD10-01392 JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  9/22/2011 DONE
DetailsTim Frost
Sent to Records for scanning.
INSP-Final Inspection8/19/20118/19/20118/19/2011APASS
DetailsForrest France
UG fire supply line permit finaled.
INSP-Final Inspection8/15/20118/15/20118/15/2011PPART
DetailsForrest France
UG permit okay for final when overhead is finaled.
INSP-Final Inspection6/15/20116/15/20116/15/2011PPART
DetailsForrest France
Final pending overhead permit work.
FIR-Aging Inspection4/29/20114/29/20115/4/2011 PART
DetailsForrest France
Site work in progress
FIR-Aging Inspection2/22/20112/22/20112/23/2011 DONE
DetailsForrest France
Work in progress.
FIR-Aging Inspection12/23/201012/23/201012/28/2010 PART
DetailsForrest France
Site work in progress
CHANGE STATUS TO (ISS)  10/27/2010 DONE
per trf
INSP-Sprinkler Rough-in/Hydro10/22/201010/22/201010/22/2010PPASS
DetailsTroy Cobbley
The underground hydro test passed.
INSP-Sprinkler Rough-in/Hydro10/20/201010/20/201010/20/2010PFAIL
DetailsForrest France
UG hydrostatic test failed due to pressure loss at the guage.
INSP-Sprinkler Rough-in10/5/201010/6/201010/8/2010PPART
DetailsForrest France
Underground fire supply line okayed for bury. Contractor to provide seismic clearance at floor slab as discussed.
Plan assigned to (Tim)9/22/2010 9/23/2010 DONE
DetailsTim Frost
9/23/2010 07:28:06 TRF - activity updated through activity FIRA22 from case FIR10-00473.
Sprinkler Plan Check9/23/2010 9/23/2010 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  9/23/2010 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  9/23/2010 DONE
DetailsTim Frost
Inspection Record Card- Fire9/23/2010 9/23/2010 DONE
DetailsPatricia Smith
Telephone call  9/23/2010 DONE
tlc w lisa at ###-#### - permit ready and fees given
Permit Ready to Issue  9/23/2010 DONE
Details
Issue and Print Permit  9/23/2010 DONE
Application received  9/22/2010  
Pending Assignment by SAM9/22/2010 9/22/2010 DONE
DetailsAlexandra L. DeYoung
9/22/2010 11:01:14 ALR - activity updated through activity FIRA158 from case FIR10-00473.