INSP-Final Inspection | 12/16/2010 | 12/16/2010 | 12/16/2010 | P | PASS |
Forrest France
|
|
|
Fire sprinkler work passed final walkthrough, permit finaled.
|
INSP-Final Inspection | 12/8/2010 | 12/9/2010 | 12/9/2010 | A | PART |
Forrest France
|
|
|
Overhead install per the scope of work approved for cover at the drop ceilings.
|
INSP-Sprinkler Rough-in/Hydro | 11/8/2010 | 11/9/2010 | 11/9/2010 | P | PART |
Forrest France
|
|
|
New branchline install okayed, new drops incomplete at this time.
|
Sprinkler Plan Check | 9/24/2010 | | 9/24/2010 | | PASS |
Troy Cobbley
|
|
|
|
1st review completed | | | 9/24/2010 | | DONE |
Troy Cobbley
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/24/2010 | | DONE |
Troy Cobbley
|
|
|
|
Issue and Print Permit | | | 9/24/2010 | | DONE |
|
|
|
|
Plan assigned to (Scott) | | | 9/22/2010 | | DONE |
Bill Alexander
|
|
|
This permit was created on the web by Paul Marcolina
|
Application received | | | 9/22/2010 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|