Miscellaneous action | | | 1/14/2011 | | DONE |
|
|
|
Sent to records for scanning.
|
INSP-Final Inspection | 12/29/2010 | 12/30/2010 | 12/30/2010 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 12/28/2010 | 12/29/2010 | 12/29/2010 | A | PASS |
Troy Cobbley
|
|
|
The overspaced heads have been adjusted. To final the FDC needs relocated as discussed, tags for both the wet and anti-freeze risers, fire alarm interconnect and canopys installed.
|
INSP-Sprinkler Rough-in | 12/28/2010 | 12/28/2010 | 12/28/2010 | P | PART |
Troy Cobbley
|
|
|
The sprinkler heads were overspaced at atleast one location along the west wall. Will need to verify spacing compliance and coverage in the kitchen area to have the overhead rough-in completed. The FDC is located too close to the wall PIV. Atleast 3' clearance is required per IFC
|
INSP-Sprinkler Rough-in | 12/14/2010 | 12/14/2010 | 12/15/2010 | P | PASS |
Troy Cobbley
|
|
|
The sprinkler piping located above the hardlids in the restroom areas can be covered.
|
Sprinkler Plan Check | 12/8/2010 | | 12/8/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/8/2010 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 12/8/2010 | | 12/8/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 12/8/2010 | | DONE |
|
|
|
left vm for bob knight - permit ready and fees given
|
Permit Ready to Issue | | | 12/8/2010 | | DONE |
|
|
|
|
Issue and Print Permit | | | 12/8/2010 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 10/11/2010 | | 12/8/2010 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 12/7/2010 | | DONE |
|
|
|
picked up denied plans
|
Plan resubmittals received | | | 12/7/2010 | | |
|
|
|
3 copies of resubmitted plans and calc. Forwarded to Fire review
|
Sprinkler Plan Check | 12/2/2010 | | 12/2/2010 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
Telephone call | | | 12/2/2010 | | DONE |
|
|
|
left vm for bob knight - permit denied - needs to be picked up and resubmitted
|
Plan resubmittals received | | | 12/1/2010 | | DONE |
Tisha Gallop
|
|
|
received three copies of application, submittal documents and plans; routed to Fire Review.
|
Sprinkler Plan Check | 11/23/2010 | | 11/23/2010 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
Telephone call | | | 11/23/2010 | | DONE |
|
|
|
t/c w bob at ###-#### - permit denied - needs to be picked up and resubmitted
|
Miscellaneous action | | | 11/23/2010 | | DONE |
Tisha Gallop
|
|
|
picked up denied plans
|
Plan resubmittals received | | | 11/18/2010 | | |
Barbara Stitt
|
|
|
|
Miscellaneous action | | | 11/9/2010 | | DONE |
|
|
|
Sent the following email to Bob Knight
I have just spoken with the building code plans examiner Carl Westfall. I understand that there is a space where drywall is attached tight to the bottom of the joist and there is plywood above the joist. I have not personally see the actual installation drawings of this area. However, it appears that NFPA 13: 2007, 11.2.3.1.4 would apply. There are quite a few exceptions to this section. Perhaps, one those exception would also apply. If no exceptions apply than a 3000 Sqft design area is required. Provide a complete detail on a the drawing of this space. Please, feel free to contact me.
|
Miscellaneous action | | | 11/9/2010 | | DONE |
|
|
|
Sent an email on 10-14-10 of previous review.
|
Miscellaneous action | | | 11/9/2010 | | DONE |
Tisha Gallop
|
|
|
picked up denied plans
|
Sprinkler Plan Check | 10/14/2010 | | 10/14/2010 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 10/14/2010 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 10/14/2010 | | DONE |
|
|
|
left vm for bob at ###-#### - permit denied - needs to be picked up and resubmitted
|
Telephone call | | | 10/12/2010 | | DONE |
|
|
|
Phoned and emailed Bob Knight to tell him I needed to talk with him in reagrds to the building construction. Carl W said he would not permit the project as shown. Until I hear from him the project will be on hold.
|
Application received | | | 10/11/2010 | | |
|
|
|
|
Pending Assignment by SAM | 10/11/2010 | | 10/11/2010 | | DONE |
Alexandra L. DeYoung
|
|
|
|