Miscellaneous action | | | 6/8/2011 | | DONE |
|
|
|
Sent to records for scanning.
|
INSP-Final Inspection | 2/1/2011 | 2/1/2011 | 2/1/2011 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 1/27/2011 | 1/28/2011 | 1/28/2011 | A | PASS |
Tim Frost
|
|
|
Additional sprinklers were installed to correct block sprinklers due to lighting.
|
INSP-Sprinkler Rough-in | 12/3/2010 | 12/3/2010 | 12/6/2010 | P | CANC |
Troy Cobbley
|
|
|
Was canceled due to time constraints.
|
INSP-Supply line flush | 11/19/2010 | 11/19/2010 | 11/19/2010 | P | PASS |
Troy Cobbley
|
|
|
The underground supply line flush passed.
|
INSP-Sprinkler Rough-in/Hydro | 11/19/2010 | 11/19/2010 | 11/19/2010 | P | PASS |
Troy Cobbley
|
|
|
The underground hydro test passed on the second attempt.
|
INSP-Sprinkler Rough-in | 11/19/2010 | 11/19/2010 | 11/19/2010 | P | PASS |
Troy Cobbley
|
|
|
The underground supply piping is ok to cover. On the first attempt to hydro the underground the pipe pushed apart. I waited while the piping was repaired and the hydro test was restarted.
|
Issue and Print Permit | | | 10/22/2010 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 10/13/2010 | | 10/14/2010 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 10/14/2010 | | 10/14/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 10/14/2010 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/14/2010 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 10/14/2010 | | 10/14/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 10/14/2010 | | DONE |
|
|
|
t/c w cameron at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 10/14/2010 | | DONE |
|
|
|
|
Case Summary | | | 10/13/2010 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 10/13/2010 | | |
|
|
|
|