Permit Information
Permit NumberFIR10-00510
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 8605 W FAIRVIEW AVE
Project NameDENNIS DILLION - CRICKET
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of extending a dry system to protect a new cricket area.


Building Department Scope:

To add onto and remodel two existing building to create a new 30,130 square foot, one story Nissan automobile dealership. The existing 10,365 square foot building, on the northwest corner will be remodeled into a showroom and sales area. The existing 4,860 square foot, premanufactured steel building on the southwest corner will be converted into a parts storage and sales area. A new 11,815 pre-engineered steel building addition will be constructed on the southeast side of the building for a service area and a 3,045 square foot, wood framed addition will be constructed to tie all of the building together. This area will contain a retail area, parts and service manager’s offices, tire storage, parts storage and part of the parts tech area. This permit also includes related site improvements. All construction per the approved plans and attached comment list. JCM –TF--
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  6/8/2011 DONE
Sent to records for scanning.
INSP-Final Inspection3/23/20113/24/20113/23/2011APASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in3/10/20113/10/20113/10/2011PPASS
DetailsTroy Cobbley
Remaining sprinkler rough-in passed. Noted additional fittings affecting remote areas 2 and 3 but per Tim the hydraulic calculations are adequate. I also noted side wall heads under overhead doors that were not shown on the plans. One door at the east end of the service bay is going to be provided with an extended coverage sidewall that will need to be field approved. I also noted that the existing pendant sprinklers in the sales area are being blocked by suspended light fixtures. This problem will need to be addressed prior to final sign off. It appears that if the lights are mounted to the ceiling they will no longer be an obstruction.
INSP-Sprinkler Rough-in/Hydro3/10/20113/10/20113/10/2011PPART
DetailsForrest France
Dry system hydrostatic and pneumatic testing passed- see activity notes under project related FIR10-00579.
FIR-Aging Inspection1/25/20111/25/20112/2/2011 NR
DetailsTroy Cobbley
Wip
INSP-Sprinkler Rough-in11/12/201011/15/201011/16/2010APART
DetailsForrest France
New dry system piping at the cricket passed rough-in inspection. Two obstruction issues repaired while on site. See approved plan annotation for one area -the "entry element" not yet built including one dry pendent head and an upright not installed.
Sprinkler Plan Check10/19/2010 10/19/2010 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  10/19/2010 DONE
DetailsTim Frost
Inspection Record Card- Fire10/19/2010 10/19/2010 DONE
DetailsDarla L Downs
Permit Ready to Issue  10/19/2010 DONE
Telephone call  10/19/2010  
10-19-10 called permit ready ///dld
Issue and Print Permit  10/19/2010 DONE
DetailsBarbara Stitt
Plan assigned to (Tim)10/13/2010 10/19/2010 DONE
DetailsTim Frost
Plan resubmittals received  10/18/2010 DONE
received 3 sets of plans /applications sent to Tim Frost for review ///dld
Sprinkler Plan Check10/15/2010 10/15/2010 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  10/15/2010 DONE
DetailsTim Frost
Miscellaneous action  10/15/2010 DONE
Emailed review to contractor
Telephone call  10/15/2010 DONE
t/c w jeff anderson at ###-#### - permit denied - needs to be picked up and resubmitted
Application received  10/13/2010 DONE
DetailsBarbara Stitt
Case Summary  10/13/2010 DONE
DetailsBarbara Stitt