Miscellaneous action | | | 6/15/2011 | | DONE |
|
|
|
Drawings taken to records for scanning.
|
INSP-Final Inspection | 4/1/2011 | 4/4/2011 | 4/4/2011 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 3/23/2011 | 3/24/2011 | 3/24/2011 | A | NR |
Forrest France
|
|
|
Forrest/Troy, They want to do a temp occupancy on the Showroom side of the original building. The only part of the fire alarm install not complete is the (2) duct detectors. They have not changed out the HVAC units yet, so the duct detectors are not operational. Please call me and let me know if this will work. Thanks, Jason ###-#### Phone #: ###-#### >> Inspection requested via web by Jason Minnick
|
FIR-Aging Inspection | 3/1/2011 | 3/1/2011 | 3/1/2011 | | NR |
Troy Cobbley
|
|
|
Work is in progress
|
INSP-Final Inspection | 12/15/2010 | 12/15/2010 | 12/15/2010 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Jennifer's permission until the existing building scope of work is complete. The scope of work in the new building is completed at this time. Signs directing the fire dept to the fire alarm panel location are to be maintained.
|
INSP-Final Inspection | 12/14/2010 | 12/14/2010 | 12/14/2010 | P | CANC |
Troy Cobbley
|
|
|
To be rescheduled for tomorrow morning.
|
INSP-Final Inspection | 12/13/2010 | 12/14/2010 | 12/14/2010 | A | FAIL |
Troy Cobbley
|
|
|
The fire alarm panel is using the same phone lines for both phone line 1 and phone line 2 outputs. Tried to test the flow switch and it exceed the maximum 90 second for alarm. Testing was stopped and will need to be rescheduled. Also the remote annunciator needs to be permanantly mounted or signage provided as discussed to direct the responding fire dept personnel to the FACP location in the second floor storage room.
|
Inspection Record Card- Fire | 10/27/2010 | | 10/27/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 10/27/2010 | | DONE |
|
|
|
t/c w jason at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 10/27/2010 | | DONE |
|
|
|
|
Issue and Print Permit | | | 10/27/2010 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 10/22/2010 | | 10/26/2010 | | DONE |
Stephanie L. Cobbley
|
|
|
|
1st review completed | | | 10/26/2010 | | DONE |
|
|
|
|
Alarm Plan Check | 10/26/2010 | | 10/26/2010 | | PASS |
Stephanie L. Cobbley
|
|
|
See review comments and redlines
|
PLANS TAKEN FRONT DESK ALARM | | | 10/26/2010 | | DONE |
|
|
|
Approved redlined plans available at front counter
|
Application received | | | 10/22/2010 | | |
|
|
|
|