Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR10-00524
StatusFinaled
Name MOUNTAIN POWER ELECT
Site Address 101 S CAPITOL BLVD
Project NameUS BANK 20TH FLOOR CORE UPGRAD
Customer Number 
ePlanReviewNo
Description
This fire alarm permit is to replace an existing speaker/strobe and add three new speaker/strobes to the existing fire alarm system due to a tenant shell and core remodel on the 20th floor. There are no initiating devices in this permit scope of work. Although the building permit is for the 19th and 20th floors, the work being done on the 19th floor does not affect the fire alarm system or devices.

Associated building permit: BLD10-01237 (US BANK - Shell and Core - 19th and 20th Floors) Permit is to upgrade the restrooms on the 20th floor, renovate the hallway on the 20th, and add a drinking fountain on the 19th floor. Approval contingent upon adhering to the approved plans on file. Work to include: installation of new accessible bathroom fixtures, [demolition of existing restroom, small walls in hallway, and wood trim], installation of new standard height drinking fountain on the 19th floor, and finishes in compliance with chapter 8 of the 2006 IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  1/20/2012 DONE
Plans taken to records for scanning.
INSP-Final Inspection11/15/201111/15/201111/15/2011PPASS
DetailsForrest France
Inspection passed. Fire alarm permit finaled.
INSP-Final Inspection9/22/20119/22/20119/22/2011PCANC
DetailsForrest France
rick - please call 1/2 hr prior Phone #: ###-####
FIR-Aging Inspection5/9/20115/9/20115/9/2011 PEND
DetailsForrest France
Need site inspection request for permit final.
FIR-Aging Inspection2/7/20112/7/20112/7/2011 DONE
DetailsForrest France
Site visit determined work is finished. Pending final inspection request per conversation with building rep.
Issue and Print Permit  10/28/2010 DONE
DetailsBarbara Stitt
Plan assigned to (Stephanie)10/22/2010 10/27/2010 DONE
DetailsStephanie L. Cobbley
1st review completed  10/27/2010 DONE
Alarm Plan Check10/27/2010 10/27/2010 PASS
DetailsStephanie L. Cobbley
See redlines and review comments
PLANS TAKEN FRONT DESK ALARM  10/27/2010 DONE
Approved redlined plans available at front counter
Inspection Record Card- Fire10/27/2010 10/27/2010 DONE
DetailsPatricia Smith
Telephone call  10/27/2010 DONE
left vm for kevin at ###-#### - permit ready and fees given
Permit Ready to Issue  10/27/2010 DONE
Details
Application received  10/22/2010