Permit Information
Permit NumberFIR10-00542
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 358 N BENJAMIN LN
Project NameAda County Paramedics Warehous
Customer NumberUDG ONLY
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of approximately 265± of 6” C-900 underground pipe, fittings and thrust blocks. This permit is for the underground only. The above ground piping is under permit FIR10-00513.


Building Department Scope:

To construct a new 7,410 square foot, one story vehicle maintenance, warehouse and office building. This building is constructed of masonry and wood framed exterior and interior walls and steel joist with metal roof deck. This permit also includes related site improvements. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  12/16/2011 DONE
DetailsTim Frost
Sent to Records for scanning.
INSP-Final Inspection4/21/20114/21/20114/21/2011PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection4/21/20114/22/20114/21/2011APASS
DetailsTroy Cobbley
Permit finaled
INSP-Supply line flush4/4/20114/4/20114/4/2011PPASS
DetailsTroy Cobbley
Underground supply line flush passed.
INSP-Sprinkler Rough-in/Hydro3/30/20113/31/20113/30/2011APASS
DetailsTroy Cobbley
hydro test passed
FIR-Aging Inspection3/29/20113/29/20113/29/2011 NR
DetailsTroy Cobbley
work is in progress
FIR-Aging Inspection1/25/20111/25/20112/2/2011 NR
DetailsTroy Cobbley
Work is in progress
Miscellaneous action  11/23/2010 DONE
Received as built drawings
INSP-Sprinkler Rough-in/Hydro11/9/201011/9/201011/9/2010PPASS
DetailsTroy Cobbley
The remaining 10' of underground supply piping is ok to cover.Plans still need to be resubmitted showing the routing changes and additional fittings.
INSP-Sprinkler Rough-in11/5/201011/5/201011/5/2010PPART
DetailsTroy Cobbley
Both of the underground supply cover inspection were called in under this permit. The installation did not match the approved plans which were not on site. I agreed to let the piping be covered under the conditions that I get to take a copy of shop drawings with "drawn" in new pipe routing and that plans are resubmitted showing the new pipe routing. Jeff agreed and I also contacted Randy. All piping was installed except for the riser stub outs for both buildings.
Issue and Print Permit  11/5/2010  
Application received  10/28/2010  
Pending Assignment by SAM10/28/2010 10/28/2010 DONE
DetailsPatricia Smith
Plan assigned to (Tim)10/28/2010 10/28/2010 DONE
DetailsTim Frost
Sprinkler Plan Check10/28/2010 10/28/2010 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  10/28/2010 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  10/28/2010 DONE
DetailsTim Frost
Inspection Record Card- Fire10/28/2010 10/28/2010 DONE
DetailsPatricia Smith
Telephone call  10/28/2010 DONE
t/c w keith - permit ready and fees given
Permit Ready to Issue  10/28/2010 DONE
Details