Permit Information
Permit NumberFIR10-00556
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 1075 N CURTIS RD Unit: 200
Project NameNorthwest Pulmonary
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of adding, relocating and removing sprinklers due to new wall and ceiling configuration. The existing spacing is based on 168 Sqft.


Building Department Scope:

Permit for tenant improvements to an existing 7,500 sq. ft. tenant space on the second story with work to include the removal of some interior non-bearing partition walls, ceiling grid, lighting, and misc. ducting and the installation of interior partition walls, suspended ceiling, lighting, ducting and related interior finishes. This building is fully sprinklered for one-hour substitution; any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by The City of Boise Fire Department. All work to be done per the approved plans and all applicable codes. CDM


Fire Sprinkler System Design/Spacing:

Hydraulics were neither supplied nor required. The existing system is a 2”x2”x1¼" The tenant improvement is located on the second floor of a three-floor building.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  12/16/2011 DONE
DetailsTim Frost
Sent to Records for scanning.
INSP-Final Inspection7/1/20117/5/20117/5/2011APASS
DetailsTroy Cobbley
Permit finaled.
INSP-Sprinkler Rough-in6/29/20116/30/20116/30/2011APASS
DetailsTroy Cobbley
The last phase of the sprinkler piping can be covered. A final inspection can be called in when all of the ceiling tile has been installed.
INSP-Sprinkler Rough-in5/17/20115/17/20115/17/2011PPASS
DetailsTroy Cobbley
The piping in two additional exam rooms and one restroom is ok to cover. See the city approved plans for the locations marked in red.
INSP-Sprinkler Rough-in4/28/20114/29/20114/29/2011APART
DetailsTroy Cobbley
Phase 3 and 5 are complete
INSP-Sprinkler Rough-in3/24/20113/25/20113/25/2011PPART
DetailsForrest France
See approved plan set for area outlined in blue highlighter and initialed with today's date for locations approved for ceiling cover.
INSP-Final Inspection2/17/20112/17/20112/17/2011PPART
DetailsTroy Cobbley
See the city approved building plans for room locations marked "ok" where the sprinkler work is complete.
INSP-Sprinkler Rough-in2/8/20112/9/20112/9/2011APASS
DetailsTroy Cobbley
See the city approved plans for locations where the sprinkler piping can be covered. It has been marked and initialed in red.
INSP-Final Inspection1/27/20111/28/20111/28/2011APART
DetailsTim Frost
Ok to cover Phase 1. Highlighted in yellow on the job site plans.
INSP-Final Inspection1/27/20111/27/20111/27/2011PNR
DetailsTim Frost
Inspector unable to contact contractor to arrange for inspection. Inspector visited jobsite and no contractor was present. Inspection cancelled.
Issue and Print Permit  11/23/2010  
Plan assigned to (Tim)11/4/2010 11/16/2010 DONE
DetailsTim Frost
Plan assigned to (Tim)11/12/2010 11/16/2010 DONE
DetailsTim Frost
Sprinkler Plan Check11/16/2010 11/16/2010 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  11/16/2010 DONE
DetailsTim Frost
Inspection Record Card- Fire11/16/2010 11/16/2010 DONE
DetailsPatricia Smith
Telephone call  11/16/2010 DONE
t/c w cameron - permit ready and fees given
Permit Ready to Issue  11/16/2010 DONE
Details
Plan resubmittals received  11/12/2010 DONE
DetailsBarbara Stitt
Sprinkler Plan Check11/9/2010 11/9/2010 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  11/9/2010 DONE
DetailsTim Frost
Telephone call  11/9/2010 DONE
t/c w cameron - permit denied - needs to be picked up and resubmitted
Application received  11/4/2010