INSP-Final Inspection | 12/1/2010 | 12/1/2010 | 12/1/2010 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 11/29/2010 | 11/29/2010 | 11/29/2010 | P | FAIL |
Troy Cobbley
|
|
|
The canopies are installed but the ceiling tile is still missing.
|
INSP-Final Inspection | 11/9/2010 | 11/10/2010 | 11/10/2010 | A | FAIL |
Troy Cobbley
|
|
|
Permit is not ready for a final yet. Not all of the ceiling tile has been installed and most of the "skirt" portion of the canopies for the pendants are missing.
|
INSP-Final Inspection | 11/8/2010 | 11/9/2010 | 11/9/2010 | A | FAIL |
Troy Cobbley
|
|
|
Mike and I could not gain access to the interior of the tenant space. No inspection was performed
|
Plan assigned to (Tim) | 11/4/2010 | | 11/8/2010 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/8/2010 | | 11/8/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 11/8/2010 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/8/2010 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 11/8/2010 | | 11/8/2010 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 11/8/2010 | | DONE |
Tisha Gallop
|
|
|
|
Issue and Print Permit | | | 11/8/2010 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | | 11/4/2010 | | |
|
|
|
|