Miscellaneous action | | | 12/16/2011 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 4/25/2011 | 4/25/2011 | 4/26/2011 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit work passed final inspection per T. Frost.
|
INSP-Final Inspection | 4/22/2011 | 4/22/2011 | 4/22/2011 | P | PASS |
Forrest France
|
|
|
Final passed and forward flow test passed.
don Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 4/22/2011 | 4/22/2011 | 4/22/2011 | P | PASS |
Forrest France
|
|
|
Overhead hydro passed on both floors.
don Phone #: ###-####
|
INSP-Final Inspection | 4/19/2011 | 4/20/2011 | 4/21/2011 | A | NR |
Forrest France
|
|
|
Provide sprinkler coverage at the second floor patio room, records indicate an overhead hydrostatic test remains, FDC appears partially obstructed. Outside bell repaired while on site.
|
INSP-Final Inspection | 4/19/2011 | 4/19/2011 | 4/20/2011 | P | NR |
Forrest France
|
|
|
Don Phone #: ###-####
|
INSP-Supply line flush | 3/25/2011 | 3/25/2011 | 3/25/2011 | P | PASS |
Tim Frost
|
|
|
Flush completed successfully.
don Phone #: ###-####
|
INSP-Final Inspection | 3/25/2011 | 3/25/2011 | 3/25/2011 | P | NR |
Tim Frost
|
|
|
Fire alarm was not ready.
don Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 3/8/2011 | 3/8/2011 | 3/8/2011 | P | DONE |
Tim Frost
|
|
|
Hydro passed.
Rough in passed except for adding one brace to the main where a new offset was added. The hydraulics had enough cushion that the offset did not adversely affect the hydraulic calculation. One drop plug in restroom awaiting ceiling.
|
INSP-Conference | 3/2/2011 | 3/2/2011 | 3/3/2011 | P | DONE |
Forrest France
|
|
|
Site visit regarding suspended light fixture placement at the east side main level. Upright sprinkler protection does not appear obstructed as currently installed.
|
INSP-Sprinkler Rough-in/Hydro | 1/19/2011 | 1/20/2011 | 1/20/2011 | A | PART |
Forrest France
|
|
|
Restrooms okayed for ceiling cover. Noted missing hangers one branch piece per line at the deck, inspectors test connections at the riser to be relocated. Full rough-in inspection not complete.
|
Issue and Print Permit | | | 12/1/2010 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 11/9/2010 | | 11/30/2010 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/30/2010 | | 11/30/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/30/2010 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 11/30/2010 | | 11/30/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 11/30/2010 | | DONE |
|
|
|
t/c w don - permit ready and fees given
|
Permit Ready to Issue | | | 11/30/2010 | | DONE |
|
|
|
|
Telephone call | | | 11/24/2010 | | DONE |
|
|
|
Waiting on new sesimic calculation for the longitudinal brace.
|
Plan resubmittals received | | | 11/19/2010 | | DONE |
|
|
|
received 3 new applications and 3 sets of plans sent to Tim Frost for review.
|
Sprinkler Plan Check | 11/15/2010 | | 11/15/2010 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 11/15/2010 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 11/15/2010 | | DONE |
|
|
|
Emailed comments to contractor
|
Telephone call | | | 11/15/2010 | | DONE |
|
|
|
t/c w don - permit denied - needs to be picked up and resbumitted
|
Application received | | | 11/9/2010 | | |
|
|
|
|