INSP-Final Inspection | 1/5/2011 | 1/6/2011 | 1/6/2011 | A | PASS |
Forrest France
|
|
|
Fire sprinkler work passed final walkthrough, inspection passed. Permit finaled.
|
INSP-Sprinkler Rough-in | 12/17/2010 | 12/17/2010 | 12/17/2010 | P | PART |
Forrest France
|
|
|
Reinspection passed, correction items finished. Overhead fire sprinkler modifications are approved for cover at the drop ceilings.
|
INSP-Sprinkler Rough-in | 12/14/2010 | 12/17/2010 | 12/17/2010 | A | FAIL |
Forrest France
|
|
|
Noted one overspaced head and a small leak to be repaired.
|
Plan assigned to (Tim) | 11/18/2010 | | 11/19/2010 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/19/2010 | | 11/19/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 11/19/2010 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/19/2010 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 11/19/2010 | | 11/19/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 11/19/2010 | | DONE |
|
|
|
t/c w brad bettencourt - permit ready and fees given
|
Permit Ready to Issue | | | 11/19/2010 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/19/2010 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 11/18/2010 | | |
|
|
|
|
Pending Assignment by SAM | 11/18/2010 | | 11/18/2010 | | DONE |
Patricia Smith
|
|
|
|