INSP-Final Inspection | 2/2/2011 | 2/3/2011 | 2/3/2011 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 1/24/2011 | 1/24/2011 | 1/24/2011 | P | PART |
Forrest France
|
|
|
Okay to cover rough-in at the grid ceilings.
|
CHANGE STATUS TO (ISS) | | | 12/1/2010 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/1/2010 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/30/2010 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 11/30/2010 | | 11/30/2010 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/30/2010 | | 11/30/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/30/2010 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 11/30/2010 | | 11/30/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 11/30/2010 | | DONE |
|
|
|
t/c w greg - permit ready and fees given
|
Permit Ready to Issue | | | 11/30/2010 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 11/24/2010 | | 11/30/2010 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/29/2010 | | 11/29/2010 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 11/29/2010 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 11/29/2010 | | DONE |
|
|
|
Emailed review to contactor.
|
Telephone call | | | 11/29/2010 | | DONE |
|
|
|
t/c w greg - permit denied - needs to be picked up and resubmitted
|
Issue and Print Permit | | | 11/29/2010 | | DONE |
|
|
|
|
Telephone call | | | 11/24/2010 | | DONE |
|
|
|
Waiting on Greg to call me back to clarify the drawing.
|
Application received | | | 11/24/2010 | | |
|
|
|
|
Pending Assignment by SAM | 11/24/2010 | | 11/24/2010 | | DONE |
Patricia Smith
|
|
|
|