Miscellaneous action | | | 12/16/2011 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 1/26/2011 | 1/26/2011 | 1/26/2011 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 1/24/2011 | 1/24/2011 | 1/24/2011 | P | FAIL |
Troy Cobbley
|
|
|
I found three pendant heads located too close to one another in the same small office.
|
INSP-Sprinkler Rough-in | 1/5/2011 | 1/5/2011 | 1/5/2011 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler piping is okay to cover.
|
Issue and Print Permit | | | 12/8/2010 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 12/2/2010 | | 12/7/2010 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 12/7/2010 | | DONE |
|
|
|
Jim Darr, told me
The customer service room is strictly an office area. There will be no storage. There will be ceiling.
The transfilling room is where they fill small oxygen bottles from their outside tanks.
The dark line shown south of the third branch line from the bottom of the drawing is a paint stripe.
|
Sprinkler Plan Check | 12/7/2010 | | 12/7/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 12/7/2010 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/7/2010 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 12/7/2010 | | 12/7/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 12/7/2010 | | DONE |
|
|
|
t/c w jim darr - permit ready and fees given
|
Permit Ready to Issue | | | 12/7/2010 | | DONE |
|
|
|
|
Telephone call | | | 12/6/2010 | | DONE |
|
|
|
Spoke with Jim Darr. Asked him what are they storing, what is the ceiling in the customer service, is there storage in custome service, what is transfilling, what is stored in transfilling. He told me the dark line on the drawing south of the third branch line is floor striping. On hold waiting on a return phone call.
|
Application received | | | 12/2/2010 | | |
|
|
|
|
Case Summary | | | 12/2/2010 | | DONE |
|
|
|
|