Case Summary | | | 6/1/2016 | | DONE |
|
|
|
|
Miscellaneous action | | | 12/16/2011 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 1/20/2011 | 1/21/2011 | 1/21/2011 | P | PASS |
Forrest France
|
|
|
Noted correction items field verified for completion. Fire sprinkler permit finaled.
|
INSP-Final Inspection | 1/19/2011 | 1/20/2011 | 1/20/2011 | A | PART |
Forrest France
|
|
|
Overhead install okayed with the exception of one lateral seismic brace at the north end 2 1/2" main. Final pending PRV at the riser and main tie-ins.
|
INSP-Sprinkler Rough-in/Hydro | 1/19/2011 | 1/20/2011 | 1/20/2011 | A | PART |
Forrest France
|
|
|
Overhead hydrostatic testing at the new addition passed.
|
INSP-Final Inspection | 1/18/2011 | 1/19/2011 | 1/19/2011 | A | NR |
Forrest France
|
|
|
justin Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 1/18/2011 | 1/19/2011 | 1/19/2011 | A | NR |
Forrest France
|
|
|
Overhead hydrostatic test not ready due to system impairment.
|
INSP-Sprinkler Rough-in | 1/10/2011 | 1/11/2011 | 1/11/2011 | A | PART |
Forrest France
|
|
|
Okay to cover grid ceiling areas at rooms below the mezzanine including upright protection below the stairs.
|
Issue and Print Permit | | | 12/9/2010 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 12/6/2010 | | 12/8/2010 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 12/8/2010 | | DONE |
|
|
|
Sent an email to Jeff Anderson with several questions. The project is on hold until I receive answers. Please, see below.
Is the space below the stairs going to the mezzanine blocked in to prevent storage?
Is the mezzanine framing noncombustible?
Is the storage arrangement in both the freezer and warehouse non encapsulated?
What is the total Sqft amount of storage in the ENTIRE system?
What is the total Sqft of the building?
|
Miscellaneous action | | | 12/8/2010 | | DONE |
|
|
|
Received and email from Jeff Anderson.
Yes, there will be NO access to store under the stairs.
No, the mezz is constructed of TJI's with sheet rock on the bottom. Protected by SSU over SSP (I informed him this would necessitate calculating 3000 Sqft) He is checking with the GC on an alternate approach.
Correct, Warehouse and Freezer both non-encapsulated commodities.
The existing Building and New building combined sqft is 38,140.
|
Sprinkler Plan Check | 12/8/2010 | | 12/8/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 12/8/2010 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/8/2010 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 12/8/2010 | | 12/8/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 12/8/2010 | | DONE |
|
|
|
left message for jeff - permit ready and fees given
|
Permit Ready to Issue | | | 12/8/2010 | | DONE |
|
|
|
|
Application received | | | 12/6/2010 | | |
|
|
|
|
Case Summary | | | 12/6/2010 | | DONE |
|
|
|
|