Permit NumberFIR10-00659
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 2770 E WINDSONG DR
Project NameQuestad Residence
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of a modified 13D sprinkler system. Sprinklers are required in all rooms.


Building Department Scope:

Permit for the construction of a new 4,403 sq. ft. one story single family dwelling with a daylight basement (basement 1,812 sq. ft. first story 2,591 sq. ft.) with 3 bedrooms, 3 1/2 bathrooms, approximately 612 sq. ft. of covered patio/porch and a 1,263 sq. ft. attached garage. All work to be done per the approved plans, plan review report and any notations. R-1A zoning and setbacks per planning CDM A letter from the applicant's geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at 384-3946. ***Modified 13D Sprinkler system is required. Including all closets, foyers and one row of dry sidewall sprinklers on the garage wall. The main riser shall be located in the garage or comply with BMC 7-01-51***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  12/16/2011 DONE
DetailsTim Frost
Sent to Records for scanning.
INSP-Final Inspection6/20/20116/20/20116/20/2011PPASS
DetailsForrest France
Verified plan modification and installation of new SW heads and piping at the bonus room above the garage. System charged while on site. Permit finaled.
CHANGE STATUS TO (ISS)  6/14/2011 DONE
DetailsBarbara Stitt
(F) Reprint permit  6/14/2011 DONE
DetailsBarbara Stitt
Inspection Record Card- Fire6/13/2011 6/13/2011 DONE
DetailsPatricia Smith
Telephone call  6/13/2011 DONE
t/c w trent - permit (plan mod) ready and fees given
Permit Ready to Issue  6/13/2011 DONE
Details
Plan resubmittals received  6/10/2011 DONE
DetailsChristina Prado
PLAN MOD**** received three copies of application, checklist, and hydralic calcs summary sheet. Also received three sets of plans 1 of 1. Routed to Tim Frost for additional review
Plan assigned to (Tim)6/10/2011 6/10/2011 DONE
DetailsTim Frost
Sprinkler Plan Check6/10/2011 6/10/2011 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  6/10/2011 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  6/10/2011 DONE
DetailsTim Frost
INSP-Final Inspection6/1/20116/2/20116/2/2011APART
DetailsForrest France
Final pending coverage at the finished room above the heated garage due to modified 13D requirements and sec. 8.6.5 NFPA13D. Remainder of installation completed satisfactory including flow switch test.
INSP-Sprinkler Rough-in/Hydro5/10/20115/11/20115/11/2011ACANC
DetailsForrest France
inspection for UG. please call Trent at ###-#### one hr before inspection. Phone #: ###-#### >> Inspection requested via web by Trent Bice Inspection cancelled from web by: Trent Bice
INSP-Sprinkler Rough-in5/10/20115/11/20115/11/2011ACANC
DetailsForrest France
request inspection for domestic water line @ same time of UG inspection. Please call Trent @ ###-#### one hr before inspection time. Phone #: ###-#### >> Inspection requested via web by Trent Bice Inspection cancelled from web by: Trent Bice
INSP-Supply line flush5/6/20115/6/20115/6/2011PDONE
DetailsForrest France
UG supply line flush completed satisfactory.
INSP-Sprinkler Rough-in3/7/20113/7/20113/8/2011PPART
DetailsForrest France
Overhead install approved for cover.
INSP-Sprinkler Rough-in3/3/20113/4/20113/4/2011APART
DetailsForrest France
Overhead install okayed for cover after discussion with contractor on site regarding batt insulation adjustments for cold cavity protection at four locations including the NW bedroom, front hall, kitchen and great room areas.
INSP-Sprinkler Rough-in2/9/20112/10/20112/10/2011APART
DetailsForrest France
Overhead rough-in passed inspection, noted sw heads at the garages are not yet installed, riser or supply manifolds are not ready at this time. Contractor to call for inspection of batt insulation at the first floor piping prior to cover- (tented areas okayed).
Issue and Print Permit  1/10/2011  
Plan assigned to (Tim)12/30/2010 1/3/2011 DONE
DetailsTim Frost
Sprinkler Plan Check1/3/2011 1/3/2011 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  1/3/2011 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  1/3/2011 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  1/3/2011 DONE
DetailsTim Frost
Inspection Record Card- Fire1/3/2011 1/3/2011 DONE
DetailsPatricia Smith
Telephone call  1/3/2011 DONE
t/c w michelle - permit ready and fees given
Permit Ready to Issue  1/3/2011 DONE
Details
Application received  12/30/2010