Permit Information
Permit NumberFIR11-00003
StatusFinaled
Name CURTIS FIRE SPRINKLER SERVICE INC
Site Address 416 S 8TH ST
Project NameDRAKE COOPER BLDG
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of changing all sprinklers on the basement and first floor to quick response type. Some sprinklers will be added, relocated and deleted to accommodate the new wall configuration.


Building Department Scope:

(DRAKE COOPER BUILDING - CORE REMODEL) This building is fire sprinklered for code trade-offs. To remodel the building core at the 8th Street entrance and in the basement. Work is to include a new stairway to the basement, a 3 stop wheelchair lift with 90 degree side exit/entrance, and a 1-hr fire-resistance-rated separation between the basement and the non-rated lobby on the 1st story. The non-rated lobby on the 1st story, in part, functions as the continuation of an existing stairway enclosure (enclosed like a 1-hr corridor) that serves the 2nd story. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. Fire sprinkler heads in the basement and on the 1st story will be replaced with quick-response heads. Tenant improvement work for “SunErgy” on the 1st story was done under permit BLD10-02758, tenant improvement work for “RDG Filings” on the 1st story was done under permit BLD10-02759, and tenant improvement work for “IntelliScience” in the basement was done under permit BLD10-02760. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  6/8/2011 DONE
Sent to records for scanning.
INSP-Final Inspection2/23/20112/23/20112/24/2011PPASS
DetailsForrest France
Fire sprinkler permit finaled.
INSP-Final Inspection1/28/20111/28/20111/28/2011PPASS
DetailsTim Frost
Sprinklers were changed to quick response per comment of previous inspection. Corrected minimum spacing issue per previous inspection
INSP-Final Inspection1/26/20111/26/20111/26/2011PCANC
DetailsForrest France
don Phone #: ###-#### ///don called in and cancelled
INSP-Sprinkler Rough-in1/12/20111/12/20111/13/2011PPART
DetailsForrest France
Noted three upright heads above the womens restroom ceiling and one ssu at the riser closet yet to be replaced with QR type per scope of work, two uprights at the basement level exceed min. spacing.
INSP-Sprinkler Rough-in/Hydro1/11/20111/12/20111/12/2011APART
DetailsForrest France
Overhead hydrostatic testing for the basement and first floor levels completed satisfactory.
INSP-Final Inspection1/11/20111/11/20111/11/2011PPART
DetailsForrest France
Corrections per last notice at the RDG tenant space verified for completion.
INSP-Final Inspection1/7/20111/10/20111/10/2011APART
DetailsForrest France
Partial overhead rough-in completed- see plans for field annotations.
INSP-Sprinkler Rough-in1/7/20111/10/20111/10/2011APART
DetailsForrest France
Rough-in inspection for the RDG area as marked on plans with today's date okayed with exceptions including one head at the womens restroom janitor closet yet to be replaced with QR and upright heads at the open office to be in compliance with NFPA 13 8.3.1.3.
Plan assigned to (Tim)1/4/2011 1/7/2011 DONE
DetailsTim Frost
Sprinkler Plan Check1/7/2011 1/7/2011 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  1/7/2011 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  1/7/2011 DONE
DetailsTim Frost
Inspection Record Card- Fire1/7/2011 1/7/2011 DONE
DetailsPatricia Smith
Telephone call  1/7/2011 DONE
t/c w don - permit ready and fees given
Permit Ready to Issue  1/7/2011 DONE
Details
Issue and Print Permit  1/7/2011 DONE
Miscellaneous action  1/5/2011 DONE
Spoke with Don Curtis. I mentioned to him that all sprinklers are required to be quick response type by the building department. He did not have quick response shown on the drawing. Theerfore, he told me to put the project on hold until he remedies the situation.
Application received  1/4/2011  
Case Summary  1/4/2011 DONE