Miscellaneous action | | | 6/15/2011 | | DONE |
|
|
|
Drawings taken to records for scanning.
|
INSP-Final Inspection | 4/26/2011 | 4/26/2011 | 4/26/2011 | P | PASS |
Forrest France
|
|
|
Fire alarm permit finaled.
|
INSP-Final Inspection | 4/22/2011 | 4/22/2011 | 4/22/2011 | P | PART |
Forrest France
|
|
|
steve Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 4/19/2011 | 4/20/2011 | 4/20/2011 | A | PART |
Forrest France
|
|
|
Final pending relocated smoke detector at the second floor elevator, if provided- the remote annunciator needs to be adjacent to the main entry, post signage at the door to the FACP room. Remainder of installation passed inspection.
|
INSP-Alarm Testing | 4/18/2011 | 4/18/2011 | 4/18/2011 | P | PART |
Forrest France
|
|
|
Site work in progress.
|
INSP-Conference | 3/7/2011 | 3/7/2011 | 3/8/2011 | P | DONE |
Forrest France
|
|
|
Regarding project schedule.
|
Issue and Print Permit | | | 3/4/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/28/2011 | | DONE |
Tisha Gallop
|
|
|
change status back to ready, was issued to wrong contractor by mistake.
|
Issue and Print Permit | | | 1/27/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Stephanie) | 1/6/2011 | | 1/20/2011 | | DONE |
Stephanie L. Cobbley
|
|
|
|
1st review completed | | | 1/20/2011 | | DONE |
|
|
|
|
Alarm Plan Check | 1/20/2011 | | 1/20/2011 | | PASS |
Stephanie L. Cobbley
|
|
|
Approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 1/20/2011 | | DONE |
|
|
|
Approved redlined plans available at front counter.
|
Inspection Record Card- Fire | 1/20/2011 | | 1/20/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 1/20/2011 | | DONE |
|
|
|
left vm for steve - permit ready and fees given
|
Permit Ready to Issue | | | 1/20/2011 | | DONE |
|
|
|
|
Application received | | | 1/6/2011 | | |
|
|
|
|