Miscellaneous action | | | 2/24/2012 | | DONE |
|
|
|
plans taken to records for scanning
|
INSP-Final Inspection | 1/25/2012 | 1/27/2012 | 1/27/2012 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. As-builts to be turned in.
|
INSP-Conference | 1/23/2012 | 1/23/2012 | 1/23/2012 | P | DONE |
Troy Cobbley
|
|
|
I met with Tamara and Charlie and discussed the project status. The projects will be followed up on and their status relayed to me.
|
INSP-Conference | 1/12/2012 | 1/12/2012 | 1/12/2012 | P | DONE |
Troy Cobbley
|
|
|
Colton had questions concerning the firemans hat light. I deferred the question to the fire alarm plan reviewer.
|
FIR-Aging Inspection | 1/12/2012 | 1/12/2012 | 1/12/2012 | | NR |
Troy Cobbley
|
|
|
Still waiting for simplexgrinnell to correct the elevator recall functions.
|
Telephone call | | | 1/12/2012 | | DONE |
|
|
|
Spoke with Colton of Simplexgrinnell regarding the elevator hat light. He stated the hat light in the elvator is not functioning and wanted to know if he could just put a cover plate over it. I told him that if he could get written verification from the state elvator inspector stating that the hat light functions are not required then he could plate over it. Otherwise, it will have to perform the required functions per NFPA 72. I let him know if he is able to obtain verification that the functions are not required, then he is to provide that to the inspector at the final inspection (not email, fax, or bring to me).
|
INSP-Final Inspection | 7/5/2011 | 7/6/2011 | 7/6/2011 | A | FAIL |
Troy Cobbley
|
|
|
Permit can be finaled when the elevator recall functions have been corrected or an upgrade agreement with the Boise Fire Dept. has been reached.
|
INSP-Final Inspection | 7/1/2011 | 7/5/2011 | 7/5/2011 | A | FAIL |
Troy Cobbley
|
|
|
The horn located at the north stairwell door makes a continuous tone and not temporal. Per Colton this device should be on a new circuit.
|
INSP-Final Inspection | 7/1/2011 | 7/1/2011 | 7/1/2011 | P | FAIL |
Troy Cobbley
|
|
|
The strobe in room 225 failed to function and the elevator, as per previous discussions, needs to be addressed.
|
INSP-Sprinkler Rough-in | 5/19/2011 | 5/20/2011 | 5/20/2011 | A | DONE |
Troy Cobbley
|
|
|
The strobes in two additional exam rooms functioned correctly. Marked ok on the plans.
|
INSP-Sprinkler Rough-in | 4/28/2011 | 4/29/2011 | 4/29/2011 | A | PART |
Troy Cobbley
|
|
|
Phase 3 and 5 are complete
|
INSP-Sprinkler Rough-in | 3/29/2011 | 3/29/2011 | 3/29/2011 | P | CANC |
Troy Cobbley
|
|
|
Wrong inspection type was called in. This was actually for alarm testing.
|
INSP-Alarm Testing | 3/29/2011 | 3/29/2011 | 3/29/2011 | P | DONE |
Troy Cobbley
|
|
|
The phase II fire alarm testing is complete. An item noted was any general smoke detector alarm would recall the elevator which is not allowed. I agreed to "sign off" for this phase II work but the elevator recall will need to be addressed prior to a final sign off on this project.
|
INSP-Alarm Testing | 2/16/2011 | 2/17/2011 | 2/17/2011 | A | DONE |
Troy Cobbley
|
|
|
See the city approved plans for devices marked ok that have been tested and passed. Research is needed to verify that the temporal signal "timing" meets NFPA 72.
|
Plan assigned to (Stephanie) | 2/14/2011 | | 2/16/2011 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Alarm Plan Check | 2/16/2011 | | 2/16/2011 | | PASS |
Stephanie L. Cobbley
|
|
|
Plan modification approved with review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 2/16/2011 | | DONE |
|
|
|
Approved plan modification documents available at front counter.
|
Inspection Record Card- Fire | 2/16/2011 | | 2/16/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 2/16/2011 | | DONE |
|
|
|
left vm for charlie - permit ready and fees given
|
Permit Ready to Issue | | | 2/16/2011 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/16/2011 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 2/16/2011 | | DONE |
Barbara Stitt
|
|
|
|
INSP-Sprinkler Rough-in | 2/8/2011 | 2/9/2011 | 2/9/2011 | A | CANC |
Troy Cobbley
|
|
|
bryan Phone #: ###-####
|
Plan resubmittals received | | | 2/9/2011 | | DONE |
|
|
|
2-9-11 received 2 applications & plans(plan mod) sent to Stephanie for review.
|
Override - Parcel Holds | | | 1/25/2011 | | |
|
|
|
|
Issue and Print Permit | | | 1/25/2011 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 1/10/2011 | | 1/24/2011 | | DONE |
Stephanie L. Cobbley
|
|
|
|
1st review completed | | | 1/24/2011 | | DONE |
|
|
|
|
Alarm Plan Check | 1/24/2011 | | 1/24/2011 | | PASS |
Stephanie L. Cobbley
|
|
|
Approved with redlines and review comments
|
PLANS TAKEN FRONT DESK ALARM | | | 1/24/2011 | | DONE |
|
|
|
Approved redlined plans available at front counter.
|
Override - Parcel Holds | | | 1/24/2011 | | |
|
|
|
|
Inspection Record Card- Fire | 1/24/2011 | | 1/24/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 1/24/2011 | | DONE |
|
|
|
t/c w charlie - permit ready and fees given
|
Override - Parcel Holds | | | 1/24/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 1/24/2011 | | DONE |
|
|
|
|
Application received | | | 1/10/2011 | | |
|
|
|
|