Miscellaneous action | | | 12/16/2011 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 10/27/2011 | 10/27/2011 | 10/27/2011 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 10/24/2011 | 10/25/2011 | 10/25/2011 | A | PART |
Forrest France
|
|
|
Verified temporary partitions have been removed. Added heads at the open areas adjacent to the new remodel okayed. Final pending installation of the remainder of ceiling tile and escutcheons.
|
INSP-Final Inspection | 10/7/2011 | 10/10/2011 | 10/10/2011 | P | CANC |
Troy Cobbley
|
|
|
Please calL Jeremy with time frame. ###-####. Thanks >> Inspection requested via web by Jeff Packham
|
INSP-Sprinkler Rough-in | 9/29/2011 | 9/29/2011 | 9/29/2011 | P | PASS |
Troy Cobbley
|
|
|
The remaining sprinkler piping is ok to cover
|
INSP-Sprinkler Rough-in/Hydro | 9/15/2011 | 9/15/2011 | 9/16/2011 | P | PART |
Forrest France
|
|
|
Pendent heads at the sheetrock ceiling area as marked on stamped plans okayed for cover.
|
Plan assigned to (Tim) | 9/8/2011 | | 9/12/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/12/2011 | | 9/12/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 9/12/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/12/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 9/12/2011 | | 9/12/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 9/12/2011 | | DONE |
|
|
|
t/c w jeff - permit (plan mod) ready and fees given
|
Permit Ready to Issue | | | 9/12/2011 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/12/2011 | | DONE |
Tisha Gallop
|
|
|
|
(F) Reprint permit | | | 9/12/2011 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/8/2011 | | DONE |
Tisha Gallop
|
|
|
PLAN MODIFICATION: received three copies of application, submittal small documents and plans; routed to Fire Review.
|
INSP-Sprinkler Rough-in | 5/25/2011 | 5/25/2011 | 5/25/2011 | P | PART |
Forrest France
|
|
|
|
INSP-Sprinkler Rough-in | 3/30/2011 | 3/30/2011 | 3/30/2011 | A | PART |
Forrest France
|
|
|
Work to date okayed for cover.
|
INSP-Sprinkler Rough-in | 3/4/2011 | 3/4/2011 | 3/4/2011 | A | PART |
Forrest France
|
|
|
East and west 1st floor lower focus rooms and BU 2nd floor focus rooms only- remainder of permit work incomplete at this time.
|
Issue and Print Permit | | | 1/18/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 1/13/2011 | | 1/14/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/14/2011 | | 1/14/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 1/14/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/14/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 1/14/2011 | | 1/14/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 1/14/2011 | | DONE |
|
|
|
left vm for jim - permit ready and fees given
|
Permit Ready to Issue | | | 1/14/2011 | | DONE |
|
|
|
|
Application received | | | 1/13/2011 | | |
|
|
|
|