Miscellaneous action | | | 6/8/2011 | | DONE |
|
|
|
Sent to records for scanning.
|
INSP-Final Inspection | 3/29/2011 | 3/29/2011 | 3/29/2011 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit final approved.
|
INSP-Sprinkler Rough-in/Hydro | 3/1/2011 | 3/1/2011 | 3/1/2011 | A | PART |
Forrest France
|
|
|
Overhead rough-in approved for cover.
|
INSP-Sprinkler Rough-in | 2/23/2011 | 2/24/2011 | 2/24/2011 | A | PART |
Forrest France
|
|
|
Correction items finished. Okay to cover overhead fire sprinkler work.
|
INSP-Sprinkler Rough-in | 2/17/2011 | 2/18/2011 | 2/23/2011 | A | PART |
Forrest France
|
|
|
Overhead modifications okay for cover per the scope of work with exception of the second floor calc. area. Also noted coverage defficiencies at some existing locations in need of adjustment prior to BLD permit final. See plans and review notes for details.
|
Issue and Print Permit | | | 2/9/2011 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/8/2011 | | 2/8/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/8/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 2/8/2011 | | 2/8/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 2/8/2011 | | DONE |
|
|
|
t/c w brodie - permit ready and fees given
|
Permit Ready to Issue | | | 2/8/2011 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/3/2011 | | DONE |
Barbara Stitt
|
|
|
|
Sprinkler Plan Check | 1/25/2011 | | 1/25/2011 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 1/25/2011 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 1/25/2011 | | DONE |
|
|
|
t/c w brodie - permit denied - needs to be picked up and resubmitted
|
Application received | | | 1/24/2011 | | |
|
|
|
|
Pending Assignment by SAM | 1/24/2011 | | | | |
|
|
|
|