Miscellaneous action | | | 6/8/2011 | | DONE |
|
|
|
Sent to records for scanning.
|
INSP-Final Inspection | 5/4/2011 | 5/5/2011 | 5/5/2011 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit work passed final inspection.
|
INSP-Sprinkler Rough-in | 3/28/2011 | 3/28/2011 | 3/28/2011 | P | PART |
Forrest France
|
|
|
Okayed for cover
|
INSP-Sprinkler Rough-in | 3/21/2011 | 3/21/2011 | 3/21/2011 | P | PART |
Forrest France
|
|
|
Verified insulation fill between joist spaces at the remodel area.
|
INSP-Sprinkler Rough-in | 3/15/2011 | 3/16/2011 | 3/16/2011 | A | PASS |
Troy Cobbley
|
|
|
Sprinkler rough-in passed. Before a approval for cover is given the insulation in the joist spaces will need to be inspected.
|
Telephone call | | | 3/8/2011 | | DONE |
Barbara Stitt
|
|
|
Left voice message for Jim Darr that permit is ready & fees due on 3-8-11 @ 8:40am//BAS
|
Issue and Print Permit | | | 3/8/2011 | | DONE |
Barbara Stitt
|
|
|
|
Sprinkler Plan Check | 3/7/2011 | | 3/7/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/7/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 3/7/2011 | | 3/7/2011 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 3/7/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plan resubmittals received | | | 3/4/2011 | | |
Barbara Stitt
|
|
|
|
Miscellaneous action | | | 2/9/2011 | | DONE |
Tisha Gallop
|
|
|
contractor picked up denied plans
|
Sprinkler Plan Check | 2/8/2011 | | 2/8/2011 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 2/8/2011 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 2/8/2011 | | DONE |
|
|
|
Emailed review to contractor.
|
Telephone call | | | 2/8/2011 | | DONE |
|
|
|
t/c w jim - permit denied - needs to be picked up and resubmitted
|
Application received | | | 2/3/2011 | | |
|
|
|
|
Pending Assignment by SAM | 2/3/2011 | | | | |
|
|
|
|