INSP-Final Inspection | 4/6/2011 | 4/7/2011 | 4/7/2011 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 2/22/2011 | 2/23/2011 | 2/23/2011 | A | PART |
Forrest France
|
|
|
Verified tenting at overhead supply pipe to the med gas room sprinkler head- blow in insulation is not yet installed.
|
INSP-Sprinkler Rough-in | 2/17/2011 | 2/18/2011 | 2/18/2011 | A | PASS |
Troy Cobbley
|
|
|
The sprinkler rough-in passed. Another inspection will required for verifying tenting.
|
Application received | | | 2/9/2011 | | |
|
|
|
|
Plan assigned to (Tim) | 2/9/2011 | | 2/9/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 2/9/2011 | | 2/9/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 2/9/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/9/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 2/9/2011 | | 2/9/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 2/9/2011 | | DONE |
|
|
|
t/c w tony - permit ready and fees given
|
Permit Ready to Issue | | | 2/9/2011 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/9/2011 | | DONE |
|
|
|
|