Miscellaneous action | | | 6/8/2011 | | DONE |
|
|
|
Sent to records for scanning.
|
INSP-Final Inspection | 4/14/2011 | 4/15/2011 | 4/15/2011 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Supply line flush | 4/14/2011 | 4/14/2011 | 4/14/2011 | P | PASS |
Troy Cobbley
|
|
|
Supply line flush and the testing of the flow switch passed.
|
INSP-Final Inspection | 4/12/2011 | 4/13/2011 | 4/13/2011 | P | FAIL |
Troy Cobbley
|
|
|
provide head wrench, provide signage, provide underground flush, test flow switch
|
INSP-Sprinkler Rough-in | 3/7/2011 | 3/8/2011 | 3/8/2011 | A | PASS |
Forrest France
|
|
|
Noted correction items per inspection dated 3/3/11 verified for completion. Overhead work okay to cover.
|
INSP-Sprinkler Rough-in | 3/2/2011 | 3/3/2011 | 3/3/2011 | P | FAIL |
Troy Cobbley
|
|
|
See the approved as-builts for items that need corrected. Revised as-builts will be required.
|
CHANGE STATUS TO (ISS) | | | 3/2/2011 | | DONE |
Christina Prado
|
|
|
Per tim Frost
|
Plan resubmittals received | | | 2/25/2011 | | DONE |
Christina Prado
|
|
|
PLAN MOD** Received four copies of Plan Mod letter; application; checklist and plan FP1. Routed to Tim Frost for review.
|
Issue and Print Permit | | | 2/16/2011 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 2/9/2011 | | 2/15/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 2/15/2011 | | 2/15/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/15/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 2/15/2011 | | 2/15/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 2/15/2011 | | DONE |
|
|
|
t/c w cameron - permit ready and fees given
|
Permit Ready to Issue | | | 2/15/2011 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/14/2011 | | DONE |
Christina Prado
|
|
|
Received three copies of application, checklist, correction letter and notes, Fire Plan submittals and plans FP1. Routed to Tim Frost for review.
|
Sprinkler Plan Check | 2/11/2011 | | 2/11/2011 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 2/11/2011 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 2/11/2011 | | DONE |
|
|
|
left vm for cameron - permit denied - needs to be picked up and resubmitted
|
Application received | | | 2/9/2011 | | |
|
|
|
|
Pending Assignment by SAM | 2/9/2011 | | 2/9/2011 | | DONE |
Tisha Gallop
|
|
|
|