INSP-Final Inspection | 10/25/2011 | 10/26/2011 | 10/26/2011 | P | PASS |
Forrest France
|
|
|
Hood suppression system operated correctly under test conditions.
|
INSP-Final Inspection | 10/12/2011 | 10/12/2011 | 10/12/2011 | P | FAIL |
Troy Cobbley
|
|
|
Per Leo, this is a Gaylord system. Per last correspondence with Ansul, all plenum spaces in Gaylord hoods are required to be protected with nozzels. This supression system has not been installed in accordance with those requirements. Forwarded an email to Leo from Ansul/Tyco corporation. No inspection performed.
|
INSP-Final Inspection | 10/7/2011 | 10/10/2011 | 10/10/2011 | A | CANC |
Troy Cobbley
|
|
|
Rod Phone #: ###-#### Rod is on vacation so I called Grinnells office, spoke to Marlene, and then spoke to Leo. He is going to schedule for later in the week.
|
INSP-Final Inspection | 10/6/2011 | 10/6/2011 | 10/6/2011 | P | CANC |
Forrest France
|
|
|
Overbooked
|
FIR-Aging Inspection | 5/2/2011 | 5/2/2011 | 5/2/2011 | A | DONE |
Forrest France
|
|
|
|
INSP-Conference | 2/23/2011 | 2/23/2011 | 2/23/2011 | P | DONE |
Forrest France
|
|
|
On site conference with contractor regarding pull station locations.
|
Application received | | | 2/16/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 2/16/2011 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/16/2011 | | DONE |
|
|
|
|