Permit Information
Permit NumberFIR11-00075
StatusFinaled
Name CRANE ALARM COMPANY
Site Address 225 N 9TH ST Unit: 300
Project NameCLEARWATER ANALYTICS
Customer Number 
ePlanReviewNo
Description
This fire alarm permit is to provide a new NAC panel to accommodate new speaker/strobes being provided due to a tenant remodel. Upon completion of construction, the new NAC panel and speakers will be tied in to the existing fire alarm system. Once the new panel is brought on-line, 12 existing speaker/strobes will be removed from the system. There is an approved early start agreement for this permit. There are no initiating devices associated with this permit scope of work. Associated building permit: BLD11-00247 (Clearwater Analytics – Partial Permit) A partial permit is issued for construction to the framing stage including rough-in electrical, plumbing, and mechanical while the plans for the space are being reviewed. Any construction not meeting code must be removed prior to framing inspection approval and any further construction being endorsed. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  6/15/2011 DONE
Drawings taken to records for scanning.
INSP-Final Inspection2/28/20112/28/20112/28/2011PPASS
DetailsForrest France
Fire alarm permit final okay per T. Cobbley. Reinspection passed.
INSP-Final Inspection2/25/20112/28/20112/28/2011AFAIL
DetailsForrest France
Inspection failed due to insufficient end of line voltage measurements per T. Cobbley.
INSP-Alarm Testing2/25/20112/25/20112/25/2011PPART
DetailsForrest France
Inspection for location, spacing, and cd settings of new notification appliances passed after corrections made while on site. Functional testing to be scheduled after normal business hours per contractor request.
Issue and Print Permit  2/24/2011 DONE
DetailsBarbara Stitt
Plan assigned to (Stephanie)2/17/2011 2/23/2011 DONE
DetailsStephanie L. Cobbley
1st review completed  2/23/2011 DONE
Alarm Plan Check2/23/2011 2/23/2011 PASS
DetailsStephanie L. Cobbley
Approved with redlines and review comments.
PLANS TAKEN FRONT DESK ALARM  2/23/2011 DONE
Approved redlined plans available at front counter.
Inspection Record Card- Fire2/23/2011 2/23/2011 DONE
DetailsPatricia Smith
Telephone call  2/23/2011 DONE
left vm for tim - permit ready and fees given
Permit Ready to Issue  2/23/2011 DONE
Details
Early Start  2/18/2011 DONE
An early start request has been approved for this project. See attached early start document.
Application received  2/17/2011