Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR11-00076
StatusFinaled
Name AMERICAN FIRE PROTECTION LLC
Site Address 225 N 9TH ST Unit: 300
Project NameClearwater Analytics
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of adding and relocating sprinklers to accommodate new wall and ceiling configuration. The existing system is a tree with 2” mains and 1ΒΌ" branch lines. All sprinklers are to be quick response. The system is supplied by a tank and fire pump located in the basement. The tank is supplied from a city main.



Building Department Scope:

(CLEARWATER ANALYTICS – Sedwick Center – Ste # 300) Permit is to remodel an existing 9,469 full floor office tenant space for a new tenant. This building is fire sprinklered to meet high rise provisions. Approval contingent upon adhering to the approved plans on file and attached plan review report. Work to include: relocation of existing preconstructed / non-combustible full height partition walls, new light switching, new accessible doors / hardware, relocate ducts and diffusers, and finishes in compliance with chapter 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW** --TRF--
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  6/8/2011 DONE
Sent to records for scanning.
INSP-Final Inspection2/25/20112/28/20112/28/2011APASS
DetailsForrest France
Fire sprinkler permit finaled.
INSP-Sprinkler Rough-in2/25/20112/25/20112/25/2011PPART
DetailsForrest France
Overhead modifications approved for cover at the drop ceilings with the exception of three locations at arm-overs in need of additional hanger support, also noted leak at one drop to be repaired.
Issue and Print Permit  2/23/2011 DONE
DetailsBarbara Stitt
Plan assigned to (Tim)2/17/2011 2/22/2011 DONE
DetailsTim Frost
Sprinkler Plan Check2/22/2011 2/22/2011 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  2/22/2011 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  2/22/2011 DONE
DetailsTim Frost
Inspection Record Card- Fire2/22/2011 2/22/2011 DONE
DetailsPatricia Smith
Telephone call  2/22/2011 DONE
left vm - permit ready and fees given
Permit Ready to Issue  2/22/2011 DONE
Details
Application received  2/17/2011  
Case Summary  2/17/2011 DONE