Miscellaneous action | | | 6/8/2011 | | DONE |
|
|
|
Sent to records for scanning.
|
INSP-Final Inspection | 2/25/2011 | 2/28/2011 | 2/28/2011 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 2/25/2011 | 2/25/2011 | 2/25/2011 | P | PART |
Forrest France
|
|
|
Overhead modifications approved for cover at the drop ceilings with the exception of three locations at arm-overs in need of additional hanger support, also noted leak at one drop to be repaired.
|
Issue and Print Permit | | | 2/23/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 2/17/2011 | | 2/22/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 2/22/2011 | | 2/22/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 2/22/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/22/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 2/22/2011 | | 2/22/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 2/22/2011 | | DONE |
|
|
|
left vm - permit ready and fees given
|
Permit Ready to Issue | | | 2/22/2011 | | DONE |
|
|
|
|
Application received | | | 2/17/2011 | | |
|
|
|
|
Case Summary | | | 2/17/2011 | | DONE |
|
|
|
|