Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR11-00077
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 611 N STEELHEAD WAY
Project NameTrinity Health
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of adding, relocating and deleting sprinklers to accommodate new wall and ceiling configuration.


Building Department Scope:

(TRINITY HEALTH) The fire sprinkler system is used for building area increase. To create a 24,796 square foot office tenant space within an existing 33,000 square foot, 1 story building. Work is to include interior nonbearing walls, modified suspended ceilings, interior doors with sidelights, interior doors, and finishes. In addition, a new 5 foot opening will be created in an existing interior wood shear wall. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. A "vanilla finish" permit (BLD10-02988) for the adjacent tenant space is included on the same drawings. An interior nonstructural demolition permit (BLD10-02923) and a partial permit (BLD10-02987) have also been issued. **CJW**


Fire Sprinkler System Design/Spacing:

The existing system is 1½”x1½x1” compound grid with a 3” center rail.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  6/8/2011 DONE
Sent to records for scanning.
INSP-Final Inspection3/31/20114/1/20114/1/2011APASS
DetailsTroy Cobbley
permit finaled
INSP-Sprinkler Rough-in/Hydro3/21/20113/21/20113/21/2011PPASS
DetailsTroy Cobbley
The overhead hydro test passed. The remaining sprinkler piping can be covered.
INSP-Sprinkler Rough-in3/10/20113/11/20113/11/2011APASS
DetailsTroy Cobbley
The remainig sprinkler piping can be covered except as clouded in red on the drawings.
INSP-Sprinkler Rough-in3/8/20113/9/20113/9/2011APASS
DetailsTroy Cobbley
See the previous city approved plans, not the new plan modifications, for area where the sprinkler piping is ok to cover noted with todays date.
Plan assigned to (Tim)3/8/2011 3/9/2011 DONE
DetailsTim Frost
Sprinkler Plan Check3/9/2011 3/9/2011 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  3/9/2011 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  3/9/2011 DONE
DetailsTim Frost
Inspection Record Card- Fire3/9/2011 3/9/2011 DONE
DetailsPatricia Smith
Telephone call  3/9/2011 DONE
t/c w jeff anderson - permit (plan mod) ready and fees given
Permit Ready to Issue  3/9/2011 DONE
Details
CHANGE STATUS TO (ISS)  3/9/2011 DONE
DetailsTisha Gallop
picked up plan mod
Plan resubmittals received  3/8/2011  
Plan Modification
INSP-Conference3/3/20113/3/20113/3/2011PDONE
DetailsTroy Cobbley
I spoke to Lonnie about that it appears that there will be significant changes in the sprinkler plans that will require resubmittals/plan modifications.
Plan assigned to (Tim)2/17/2011 2/18/2011 DONE
DetailsTim Frost
Sprinkler Plan Check2/18/2011 2/18/2011 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  2/18/2011 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  2/18/2011 DONE
DetailsTim Frost
Inspection Record Card- Fire2/18/2011 2/18/2011 DONE
DetailsBarbara Stitt
Permit Ready to Issue  2/18/2011 DONE
DetailsBarbara Stitt
Telephone call  2/18/2011 DONE
DetailsBarbara Stitt
Called Jeff Anderson and told him that permit is ready and fees due on 2-18-11 on 2-18-11 @ 11:45pm
Issue and Print Permit  2/18/2011 DONE
Application received  2/17/2011