INSP-Final Inspection | 4/26/2011 | 4/27/2011 | 4/28/2011 | P | PASS |
Forrest France
|
|
|
Demo permit finaled.
|
INSP-Sprinkler Rough-in | 4/26/2011 | 4/26/2011 | 4/26/2011 | P | PART |
Forrest France
|
|
|
Verified blank flange at the 90 below grade including existing thrust block.
|
INSP-Sprinkler Rough-in/Hydro | 3/30/2011 | 3/30/2011 | 3/30/2011 | A | PART |
Forrest France
|
|
|
|
Application received | | | 2/23/2011 | | |
|
|
|
|
Pending Assignment by SAM | 2/23/2011 | | 2/23/2011 | | DONE |
Patricia Smith
|
|
|
|
Plan assigned to (Tim) | 2/23/2011 | | 2/23/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 2/23/2011 | | 2/23/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 2/23/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/23/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 2/23/2011 | | 2/23/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 2/23/2011 | | DONE |
|
|
|
t/c w brodie - permit ready and fees given
|
Permit Ready to Issue | | | 2/23/2011 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/23/2011 | | DONE |
|
|
|
|