Permit Information
Permit NumberFIR11-00103
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 408 E PARKCENTER BLVD Unit: 200
Project NameRiver Quarry Bldg B
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of adding and relocating sprinklers to accommodate new wall and ceiling configuration. The original shell permit was FIR99-00668. The original TI permit was FIR00-00076.


Building Department Scope:

Permit is to separate off a 3,683 square foot area off an existing 16,171 square foot 2nd floor tenant space for a new tenant. Approval is contingent upon adhering to the approved plans on file. Work to include: [construction of interior non-bearing walls to create a new office, a new copy room, a new server room, a new break room, and to separate this space from the remainder], infill existing door openings, create new door openings, installation of new doors / accessible hardware, and finishes in compliance with chapter 8 of the 2006 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**


Fire Sprinkler System Design/Spacing:

The sprinklers are based on 16’x16’ spacing. The original third floor calculations were .10/980 + 100 Hose, with 5 sprinklers flowing at 30.2 Gpm @ 7 Psi. The original demand was 164 Gpm @ 48.5 Psi The original flow test was 55 Static, 20 Residual, 3000 Gpm and 11-19-1999 Date
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/14/201111/14/201111/14/2011APASS
DetailsForrest France
Scope of work completed. Fire sprinkler permit finaled.
INSP-Final Inspection5/2/20115/2/20115/2/2011APART
DetailsForrest France
Final pending ceiling tile and escutcheons.
INSP-Sprinkler Rough-in3/31/20114/1/20114/1/2011APART
DetailsForrest France
Overhead fire sprinkler work approved for cover at the grid ceilings within the tenant remodel area.
Issue and Print Permit  3/16/2011 DONE
DetailsBarbara Stitt
Plan assigned to (Tim)3/9/2011 3/10/2011 DONE
DetailsTim Frost
Sprinkler Plan Check3/10/2011 3/10/2011 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  3/10/2011 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  3/10/2011 DONE
DetailsTim Frost
Inspection Record Card- Fire3/10/2011 3/10/2011 DONE
DetailsPatricia Smith
Telephone call  3/10/2011 DONE
t/c w sam - permit ready and fees given
Permit Ready to Issue  3/10/2011 DONE
Details
Application received  3/9/2011