Miscellaneous action | | | 9/22/2011 | | DONE |
|
|
|
Sent to records for scanning.
|
INSP-Final Inspection | 6/16/2011 | 6/16/2011 | 6/16/2011 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit work passed final inspection.
|
INSP-Sprinkler Rough-in | 5/9/2011 | 5/9/2011 | 5/12/2011 | P | PART |
Forrest France
|
|
|
|
INSP-Sprinkler Rough-in | 4/6/2011 | 4/6/2011 | 4/7/2011 | P | PART |
Forrest France
|
|
|
Intermediate temp. heads/escutcheons at two locations verified 4/6.
|
INSP-Sprinkler Rough-in/Hydro | 3/23/2011 | 3/24/2011 | 3/24/2011 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler modifications at the new drop ceilings are okay for cover. Note: two intermediate temp concealed heads as marked on plans will need to be provided with 165 deg. escutcheons per submital.
|
INSP-Sprinkler Rough-in | 3/23/2011 | 3/23/2011 | 3/23/2011 | P | PART |
Forrest France
|
|
|
Rough to cover at new ceiling configuration.
|
INSP-Conference | 3/21/2011 | 3/21/2011 | 3/21/2011 | P | DONE |
Forrest France
|
|
|
Regarding spacing and coverage at cloud ceilings.
|
Application received | | | 3/16/2011 | | |
|
|
|
|
Plan assigned to (Tim) | 3/16/2011 | | 3/16/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 3/16/2011 | | 3/16/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 3/16/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/16/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 3/16/2011 | | 3/16/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 3/16/2011 | | DONE |
|
|
|
t/c w jim - permit ready and fees given
|
Permit Ready to Issue | | | 3/16/2011 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/16/2011 | | DONE |
Barbara Stitt
|
|
|
|