INSP-Final Inspection | 7/11/2011 | 7/12/2011 | 7/12/2011 | P | PASS |
Forrest France
|
|
|
Verified revised plans match installation. Fire sprinkler permit finaled.
|
Miscellaneous action | | | 7/7/2011 | | DONE |
|
|
|
Revised plans approved and stamped per onsite plan review by T. Cobbley.
|
INSP-Final Inspection | 5/26/2011 | 5/26/2011 | 5/26/2011 | P | PART |
Forrest France
|
|
|
Final pending installation matching approved plans. Drawings indicate 1 1/2" piping to supply the new pendent heads. Field install was completed using 1". Provide revised plans or modify work to reflect the design.
|
1st review completed | | | 3/31/2011 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/31/2011 | | 3/31/2011 | | PASS |
Stephanie L. Cobbley
|
|
|
Passed per onsite plan review by T. Cobbley
|
PLANS TAKEN FRONT DESK ALARM | | | 3/31/2011 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/31/2011 | | DONE |
|
|
|
|
Plan assigned to (Scott) | | | 3/23/2011 | | DONE |
Bill Alexander
|
|
|
This permit was created on the web by Paul Marcolina
|
Application received | | | 3/23/2011 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|