Miscellaneous action | | | 6/15/2011 | | DONE |
|
|
|
Drawings taken to records for scanning.
|
Miscellaneous action | | | 6/15/2011 | | DONE |
|
|
|
Drawings taken to records for scanning.
|
INSP-Final Inspection | 5/23/2011 | 5/23/2011 | 5/23/2011 | P | PASS |
Forrest France
|
|
|
Final fire alarm testing passed. Correction items are complete. Note: Station Captain J. Rabbit okayed waiver on knox box requirement per review note.
|
INSP-Final Inspection | 5/13/2011 | 5/16/2011 | 5/19/2011 | P | FAIL |
Forrest France
|
|
|
Noted items include; relocate the SD at the captains room a min.of 3' away from the door to the bathroom, provide a strobe only at the public restroom due to excessive db, repair comm. trouble condition at the panel.
|
INSP-Final Inspection | 5/9/2011 | 5/10/2011 | 5/12/2011 | P | FAIL |
Forrest France
|
|
|
C/N items include; provide a WP appliance at the captains RR per red-line notes, study room 113 HD should be changed to a smoke detector, provide a lock at the breaker to the FACP, post signage at the door to the panel room per review note #37, provide an accurate scanable as-built copy reflecting field modifications, repair comm. fault at the panel, knox box per review note #36 may not be required. HD's tested okay, AES not inspected at this time.
|
INSP-Conference | 4/25/2011 | 4/25/2011 | 4/26/2011 | P | DONE |
Forrest France
|
|
|
Regarding appliance locations at the weight room, plan annotations, SD spacing.
|
Plan assigned to (Stephanie) | 3/29/2011 | | 4/18/2011 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Alarm Plan Check | 4/18/2011 | | 4/18/2011 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 4/18/2011 | | DONE |
|
|
|
Approved redlined plans available at front counter.
|
Inspection Record Card- Fire | 4/18/2011 | | 4/18/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 4/18/2011 | | DONE |
|
|
|
t/c w lori - permit ready and fees given
|
Permit Ready to Issue | | | 4/18/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/18/2011 | | DONE |
|
|
|
|
Issue and Print Permit | | | 4/18/2011 | | DONE |
|
|
|
|
Plan resubmittals received | | | 4/11/2011 | | DONE |
Tisha Gallop
|
|
|
received application and two copies of submittal folder and plans; taken to Fire Review.
|
1st review completed | | | 4/6/2011 | | DONE |
|
|
|
|
Alarm Plan Check | 4/6/2011 | | 4/6/2011 | | FAIL |
Stephanie L. Cobbley
|
|
|
Plans denied. See review comments and redlines
|
Miscellaneous action | | | 4/6/2011 | | DONE |
|
|
|
Faxed review comments to applicant.
|
Miscellaneous action | | | 4/6/2011 | | DONE |
|
|
|
Redlined plans and comments available at front counter.
|
Application received | | | 3/29/2011 | | |
|
|
|
|