INSP-Final Inspection | 7/11/2013 | 7/11/2013 | 7/12/2013 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
FIR-Aging Inspection | 7/11/2013 | 7/11/2013 | 7/11/2013 | | PASS |
Troy Cobbley
|
|
|
|
FIR-Aging Inspection | 4/10/2013 | 4/10/2013 | 4/10/2013 | | NR |
Troy Cobbley
|
|
|
Jeff is going to follow up on job status per phone conversation.
|
FIR-Aging Inspection | 8/9/2012 | 8/9/2012 | 8/9/2012 | | NR |
Troy Cobbley
|
|
|
Left voice message for Jeff at TVFP requesting follow up.
|
FIR-Aging Inspection | 3/13/2012 | 3/13/2012 | 3/16/2012 | | NR |
Troy Cobbley
|
|
|
Per my phone conversation with Jeff there will be a follow up on this permit.
|
INSP-Conference | 4/19/2011 | 4/19/2011 | 4/19/2011 | P | DONE |
Troy Cobbley
|
|
|
The inspection today was to certify the controller with factory rep. Jeff Packham is going to schedule a full fire pump test very soon with the city of boise inspectors present.
|
INSP-Conference | 4/12/2011 | 4/12/2011 | 4/12/2011 | P | PASS |
Troy Cobbley
|
|
|
Inspection was to verify the automatic operation of the temporary controller.
|
Plan assigned to (Tim) | 3/31/2011 | | 4/4/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/4/2011 | | 4/4/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 4/4/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/4/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 4/4/2011 | | 4/4/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 4/4/2011 | | DONE |
|
|
|
t/c w jim - permit ready and fees given
|
Permit Ready to Issue | | | 4/4/2011 | | DONE |
|
|
|
|
Issue and Print Permit | | | 4/4/2011 | | DONE |
|
|
|
|
Application received | | | 3/31/2011 | | |
|
|
|
|
Pending Assignment by SAM | 3/31/2011 | | 3/31/2011 | | DONE |
Patricia Smith
|
|
|
|