Miscellaneous action | | | 6/8/2011 | | DONE |
|
|
|
Sent to records for scanning.
|
INSP-Final Inspection | 5/2/2011 | 5/3/2011 | 5/4/2011 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit work passed final inspection.
|
INSP-Sprinkler Rough-in/Hydro | 5/2/2011 | 5/2/2011 | 5/2/2011 | P | PASS |
Forrest France
|
|
|
Overhead rough-in passed. Ready for final.
|
INSP-Sprinkler Rough-in | 4/7/2011 | 4/7/2011 | 4/7/2011 | P | PART |
Forrest France
|
|
|
Overhead fire sprinkler work approved for cover at the sheetrock ceilings.
|
Issue and Print Permit | | | 4/6/2011 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 4/4/2011 | | 4/5/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/5/2011 | | 4/5/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 4/5/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/5/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 4/5/2011 | | 4/5/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 4/5/2011 | | DONE |
|
|
|
left vm for greg - permit ready and fees given
|
Permit Ready to Issue | | | 4/5/2011 | | DONE |
|
|
|
|
Application received | | | 4/4/2011 | | |
|
|
|
|