Miscellaneous action | | | 9/22/2011 | | DONE |
|
|
|
Sent to records for scanning.
|
INSP-Final Inspection | 5/25/2011 | 5/26/2011 | 5/26/2011 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 5/25/2011 | 5/25/2011 | 5/25/2011 | P | CANC |
Troy Cobbley
|
|
|
Cancelled due to time constraints. Rescheduled for tomorrow.
|
INSP-Final Inspection | 5/24/2011 | 5/25/2011 | 5/25/2011 | A | FAIL |
Troy Cobbley
|
|
|
Jeremy is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus.
Left message with Melodie at office I was on the way. Contractor not on site. Shipping clips were still on heads and second piece of the canopies is missing as well.
|
INSP-Sprinkler Rough-in | 5/5/2011 | 5/6/2011 | 5/6/2011 | A | PASS |
Troy Cobbley
|
|
|
Piping can be covered.
|
Issue and Print Permit | | | 4/13/2011 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 4/8/2011 | | 4/12/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/12/2011 | | 4/12/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 4/12/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/12/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 4/12/2011 | | 4/12/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 4/12/2011 | | DONE |
|
|
|
left vm for cameron - permit ready and fees given
|
Permit Ready to Issue | | | 4/12/2011 | | DONE |
|
|
|
|
Application received | | | 4/8/2011 | | |
|
|
|
|