INSP-Final Inspection | 4/27/2011 | 4/28/2011 | 4/28/2011 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 4/21/2011 | 4/21/2011 | 4/21/2011 | P | FAIL |
Troy Cobbley
|
|
|
Can't final until the ceiling tile has been installed.
|
INSP-Sprinkler Rough-in | 4/21/2011 | 4/21/2011 | 4/21/2011 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.
|
INSP-Final Inspection | 4/19/2011 | 4/19/2011 | 4/19/2011 | P | CANC |
Troy Cobbley
|
|
|
Canceled due to time constraints. Spoke to Jeremy and asked him to call the permit back in for reinspection
|
INSP-Sprinkler Rough-in | 4/19/2011 | 4/19/2011 | 4/19/2011 | P | CANC |
Troy Cobbley
|
|
|
Canceled due to time constraints. Spoke to Jeremy and asked him to call the permit back in for reinspection
|
Issue and Print Permit | | | 4/13/2011 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 4/12/2011 | | |
|
|
|
|
Pending Assignment by SAM | 4/12/2011 | | 4/12/2011 | | DONE |
Patricia Smith
|
|
|
|
Plan assigned to (Tim) | 4/12/2011 | | 4/12/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/12/2011 | | 4/12/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 4/12/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/12/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 4/12/2011 | | 4/12/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 4/12/2011 | | DONE |
|
|
|
left vm for brodie - permit ready and fees given
|
Permit Ready to Issue | | | 4/12/2011 | | DONE |
|
|
|
|