Miscellaneous action | | | 9/22/2011 | | DONE |
|
|
|
Sent to records for scanning.
|
INSP-Final Inspection | 8/9/2011 | 8/9/2011 | 8/9/2011 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit passed final inspection.
|
INSP-Sprinkler Rough-in | 7/27/2011 | 7/27/2011 | 7/27/2011 | P | PART |
Forrest France
|
|
|
Missing retainers added at end branch lines. Overhead okayed to cover.
|
INSP-Sprinkler Rough-in/Hydro | 7/19/2011 | 7/19/2011 | 7/19/2011 | P | PART |
Forrest France
|
|
|
Pendent heads at the parts room, life test #2 and #1 inspected today. Noted missing retainers at four end of line hangers to be installed.
|
INSP-Sprinkler Rough-in/Hydro | 7/11/2011 | 7/11/2011 | 7/11/2011 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler work approved for cover at the drop ceilings.
|
INSP-Sprinkler Rough-in | 7/1/2011 | 7/6/2011 | 7/6/2011 | A | PART |
Forrest France
|
|
|
Overhead rough-in inspection completed acceptable.
|
INSP-Sprinkler Rough-in/Hydro | 6/27/2011 | 6/27/2011 | 6/28/2011 | P | PART |
Forrest France
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 6/28/2011 | 6/28/2011 | 6/28/2011 | P | PART |
Forrest France
|
|
|
Hydrostatic testing completed acceptable.
|
Plan assigned to (Tim) | 4/20/2011 | | 6/6/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/6/2011 | | 6/6/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/6/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 6/6/2011 | | 6/6/2011 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 6/6/2011 | | |
Barbara Stitt
|
|
|
|
Telephone call | | | 6/6/2011 | | DONE |
Barbara Stitt
|
|
|
Called Jeff Anderson and told him that plans are ready//6/6/11 @ 9:30am//BAS
|
Issue and Print Permit | | | 6/6/2011 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/2/2011 | | DONE |
Tisha Gallop
|
|
|
received three copies of application, submittal documents and plans; routed to Fire Review.
|
Early Start | | | 5/13/2011 | | PASS |
|
|
|
Please, see attached document
|
Sprinkler Plan Check | 4/21/2011 | | 4/21/2011 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 4/21/2011 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 4/21/2011 | | DONE |
|
|
|
t/c w jim - permit denied - needs to be picked up and resubmitted
|
Application received | | | 4/20/2011 | | |
|
|
|
|