Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR11-00204
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 7701 W NORTHVIEW ST
Project NameMorley Nelson Elementary
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of adding new above and below protection to new extension of a wing at an existing school. The existing branch lines are being extended to provide protection for the addition. There will be no new main piping. The feed main supplying the existing wing is a long run of 3” pipe. The existing cross main is also 3”. The existing branch lines are 1½”” with 2” riser nipples. The new extension of the branch lines will be 2”.


Building Department Scope:

Morley Nelson Elementary School - Classroom Addition - To construct a 5,627 square foot, one story classroom and restroom addition at the south end of the south wing of an existing 58,243 square foot elementary school. The addition is constructed of masonry exterior walls with wood framed roof trusses and metal interior stud walls, to match existing school construction. The addition contains four new classrooms and two new accessible restrooms. This permit also includes related site improvements. The original school building was completed in 2008 under building permit BLD06-03277. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  9/22/2011 DONE
Sent to records for scanning.
INSP-Final Inspection8/1/20118/2/20118/2/2011APASS
DetailsTroy Cobbley
permit passed
INSP-Sprinkler Rough-in7/22/20117/25/20117/25/2011APASS
DetailsTroy Cobbley
Sprinkler piping can be covered. The branchline tie-ins are not completed but will be verified from the mechanical mezzanine at the final inspection.
Issue and Print Permit  6/1/2011 DONE
DetailsBarbara Stitt
Sprinkler Plan Check5/25/2011 5/25/2011 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  5/25/2011 DONE
DetailsTim Frost
Inspection Record Card- Fire5/25/2011 5/25/2011 DONE
DetailsPatricia Smith
Telephone call  5/25/2011 DONE
left vm for don - permit ready and fees given
Permit Ready to Issue  5/25/2011 DONE
Details
Plan assigned to (Tim)5/6/2011 5/25/2011 DONE
DetailsTim Frost
Miscellaneous action  5/25/2011 DONE
Received new drawing today. Therefore, I am able to complete the review.
Miscellaneous action  5/23/2011 DONE
Heard from Trent he said the architect had told him the underground was moved. I told him I needed a new drawing to match actual condition.
Miscellaneous action  5/20/2011 DONE
Spoke with Trent told him the underground was still a problem and could not approve the project. He was going to look into the matter.
Miscellaneous action  5/16/2011 DONE
Drawing was not changed in regards to UDG. Left Trent a voice mail.
Plan resubmittals received  5/16/2011  
DetailsTim Frost
Sprinkler Plan Check5/10/2011 5/10/2011 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  5/10/2011 DONE
DetailsTim Frost
Miscellaneous action  5/10/2011 DONE
Emailed review comment to contractor.
Telephone call  5/10/2011 DONE
left vm for don - permit denied - needs to be picked up and resubmitted
Application received  5/6/2011